47.Route the threaded end of the Press Cable (72) around the 3 1/2” Pulley (24) that was mounted on the bracket on the Weight Base (5) in an earlier step.

48.Wrap the Press Cable (72) over a 4 1/2” Pulley (82) in the direction shown. Attach the Pulley inside the indicated bracket on the Weight Top Frame (66) with a 3/8” x 1 3/4” Bolt (57) and a 3/8” Nylon Locknut (50). Make sure the end of the Cable is routed through the bracket, as shown.

49.Attach the threaded end of the Press Cable (72) to the remaining “U”-Bracket (97) with a 1/4” Flat Washer (71) and a 1/4” Nylon Locknut (68).

Attach the “U”-Bracket (97) to the hole in the Long Weight Tube (70) with a 5/16” x 1 3/4” Bolt (96) and a 5/16” Nylon Locknut (64). Note: Do not completely tighten the Nylon Locknut; it should be threaded only two turns onto the end of the Cable, as shown in the inset drawing.

Important: Follow all four cables from end to end and make sure that they rest in the grooves of all pulleys and that the cables and the pulleys move smoothly.

19

47

 

 

72

 

24

 

5

48

 

50

82

 

72

 

 

57

66

 

49

 

 

72

 

72

 

68

 

97

72

 

 

64

97

 

96

71

 

70

68

 

Page 19
Image 19
Weider 831.159730 user manual