15. Wrap the Long Cable (23) over a | 15 |
|
|
Attach the |
|
| |
|
|
| |
to the Front Upright (42) with a 3/8” x 2 1/2” Bolt |
| 6 | 7 |
(7) and a 3/8” Nylon Locknut (21).Make sure | 42 |
| |
|
| ||
that the Long Cable Trap is positioned to hold |
|
| |
|
|
| |
the Cable in the groove of the |
|
| 50 |
|
|
| |
|
| 23 |
|
|
| 21 |
|
16. Route the Long Cable (23) around a | 16 |
|
|
(6). Attach the |
|
| |
|
|
| |
(50) to the Left Arm (47) with a 3/8” x 2 1/2” Bolt |
|
|
|
(7) and a 3/8” Nylon Locknuts (21).Make sure |
| 7 | 50 |
that the Long Cable Trap is positioned to hold |
| 6 | |
the Cable in the groove of the |
|
| |
|
|
| |
Repeat this step with the Right Arm (48). |
|
| 23 |
|
| 47 | |
|
| 21 | |
| 48 |
| |
|
|
| |
| 47 |
|
|
17. Note: The parts used in this step have been | 17 |
|
|
preassembled. They are shown exploded in |
|
| |
| 68 |
| |
this drawing for clarity. |
|
| |
Route the Long Cable (23) over the 3 1/2” Pulley | 20 | 66 |
|
21 |
| ||
(15) attached to the Pulley Bracket (20). Make | 15 |
| |
sure that the Cable Trap (66) is oriented to |
|
| |
| 12 |
| |
hold the Cable in the groove of the Pulley. | 3 |
| |
| 55 | ||
Tighten the 3/8” x 2” Bolt (12) and the 3/8” Nylon |
| ||
|
| ||
Locknut (21). | 23 |
|
|
Properly tighten the 5/16” x 5” Bolt (68) and a |
|
| Bracket |
5/16” Nylon Locknut (3) attaching the Pulley |
|
| |
|
|
| |
Bracket (20) to the bracket on the Top Frame |
|
|
|
(55). Do not overtighten the Locknut; the |
|
|
|
Pulley Bracket must be able to pivot easily. | 18 |
|
|
|
|
| |
18. Wrap the Long Cable (23) under a 3 1/2” Pulley |
|
|
|
(15). Attach the Pulley and a Cable Trap (66) to |
| 23 |
|
the indicated hole in the Long |
|
| |
with a 3/8” x 2” Bolt (12) and a 3/8” Nylon | 15 | 66 |
|
Locknut (21). Make sure that the Cable Trap is |
| ||
oriented to hold the Cable in the groove of the | 12 | 21 |
|
Pulley. |
| ||
| 57 |
| |
|
|
| |
| 10 |
|
|