18. Route the Medium Cable (69) over a Pulley (87) | 18 |
|
|
|
and down through the Weight Guide Top Frame |
|
|
| |
|
|
|
| |
(49). Attach the Pulley inside the Top Frame with | 34 |
|
|
|
an M10 x 75mm Bolt (92), two M10 Washers | 35 | 87 | 49 | |
(35), two 17mm Spacers (89), and an M10 Nylon |
| 89 |
|
|
Locknut (34). |
|
|
| |
|
|
|
| |
|
|
|
| 89 |
| 69 |
|
| 35 |
|
|
|
| 92 |
19. Wrap the Medium Cable (69) under a Pulley (87). | 19 |
|
|
|
Attach the Pulley and a Cable Trap (88) to the |
|
|
| |
|
|
|
| |
indicated hole in the Pulley Plates (82) with an |
|
|
|
|
M10 x 45mm Bolt (33) and an M10 Nylon Locknut |
|
|
|
|
(34). Make sure the Cable Trap is oriented to |
|
|
|
|
hold the Cable in the groove of the Pulley. | 34 | 69 |
|
|
|
| 87 |
| |
|
|
|
| |
|
| 88 |
| |
|
| 82 | 33 |
|
|
|
|
| |
20. Route the Medium Cable (69) up through the | 20 |
|
|
|
Weight Guide Top Frame (49), over a Pulley (87), |
|
|
| |
|
|
|
| |
and back down through the Top Frame. Attach |
|
| 87 |
|
the Pulley inside the Top Frame with an M10 x |
|
|
| |
34 | 69 | 49 |
| |
75mm Bolt (92), two M10 Washers (35), two |
| |||
|
| |||
17mm Spacers (89), and an M10 Nylon Locknut | 35 |
|
|
|
89 |
|
|
| |
(34). |
| 89 |
| |
|
|
| ||
|
|
|
| |
|
|
|
| 92 |
|
|
| 35 |
|
21. Attach the Medium Cable (69) to the M10 x | 21 |
|
|
|
19mm Bolt (102) in the Weight Carriage (62) with | 69 |
|
| |
|
|
| ||
an M10 Nylon Locknut (34). |
|
|
| |
|
|
|
| |
|
| 34 |
| 102 |
|
| 62 |
|
|
13