17. Route the Cable (21) through the top of the Lat

17

 

Storage

 

Tower (14); make sure that the Cable is

66 64 52

 

under the storage hook.

 

Hook

 

Next, wrap the Cable (21) over the Pulley (22),

 

22

52

64

 

and attach the Pulley inside the Lat Tower (14)

 

 

57

with an M10 x 60mm Bolt (57), two M10 Black

 

 

 

 

Washers (64), two 16mm x 10mm Spacers

 

 

21

 

 

(52), and an M10 Black Locknut (66).

 

 

 

 

Insert an M10 x 20mm Bolt (63) into the bracket

 

 

14

 

 

on the Weight Carriage (15).

 

 

 

 

Slide the Weight Carriage (15) onto the Lat

 

 

 

 

 

Tower (14).

 

 

 

 

 

Then, slide the end of the Cable (21) onto the

 

 

63

 

 

M10 x 20mm Bolt (63) and tighten an M10

 

66

 

 

Black Locknut (66) onto the Bolt.

 

15

 

 

 

 

 

 

 

18.Make sure that all parts are properly tightened before you use the weight bench. The use of all remaining parts will be explained in ADJUSTMENT, starting on page 13.

12

Page 12
Image 12
Weider WEEVBE1409.0, 240 TC manual Tower 14 make sure that the Cable is, Under the storage hook