11.

Route the Long Cable (42) under a 90mm

11

 

 

 

 

 

Pulley (38). Attach the Pulley, a Cable Trap

 

 

 

 

 

 

 

42

37

 

 

(39), and two Half Guards (37) to the indicated

 

 

 

 

 

 

 

 

 

hole in the Base (2) (see the inset drawing) with

 

 

38

 

 

 

an M10 x 52mm patch Screw (76) and an M10

 

37

 

89

 

 

 

 

 

Washer (59). Make sure that the Cable Trap

 

 

 

59

 

 

is oriented to hold the Cable in the groove

 

 

39

 

 

 

of the Pulley.

 

 

 

 

 

 

 

 

 

 

 

 

Hole

2

 

 

 

 

 

 

 

 

 

 

 

 

 

 

2

 

12.

Attach a Pulley Bracket (17) to the indicated

12

 

 

 

 

 

“U”-channel (18) with an M10 x 132mm Button

 

 

 

 

 

 

 

 

 

 

 

Bolt (72), two M10 Washers (59), and an M10

 

 

 

18

 

 

Nylon Locknut (56).

 

 

 

 

 

 

Wrap the Long Cable (42) over a 90mm Pulley

 

72

59

17

59

 

(38). Attach the Pulley inside the Pulley Bracket

 

 

(17) with an M10 x 42mm Button Bolt (71) and

 

 

 

 

 

 

an M10 Nylon Locknut (56).

 

 

 

 

56

 

 

 

 

 

 

 

 

 

 

71

 

56

 

 

 

 

 

 

 

 

 

 

38

 

42

 

 

 

 

 

 

13.

Wrap the Long Cable (42) under a 90mm

13

 

 

 

 

 

Pulley (38). Attach the Pulley, a Cable Trap

 

 

 

 

 

 

 

 

 

 

 

(39), and two Half Guards (37) to the Base (2)

 

 

 

 

 

 

with an M10 x 52mm Patch Screw (89) and an

 

 

42

 

 

 

M10 Washer (59). Make sure that the Cable

 

 

 

89

 

 

 

 

 

 

Trap is oriented to hold the Cable in the

 

 

 

 

 

 

groove of the Pulley.

 

 

37

 

37

 

 

 

 

 

 

Note: The Half Guards (37) attached in this

 

 

 

 

59

 

step will overlap the Half Guards attached in

 

 

 

38

 

steps 8 and 11.

 

 

 

39

 

 

 

 

 

 

 

2

 

 

10

 

 

 

 

Page 10
Image 10
Weider WESY2966.0 user manual