16. Locate the Fulcrum (18) on the Lat Tower (4) (see

16

 

 

86

 

 

 

the inset drawing). Slide the Tray (35) onto the

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Back

 

rods on the Fulcrum. Make sure the Tray is ori-

 

 

 

 

 

 

ented as shown in the drawing.

 

 

 

 

 

 

 

Set the Resistance Bars into the Tray (35) in the

 

 

 

 

 

72

 

 

 

 

 

 

 

 

following order: the 10-pound Removable

 

 

 

 

 

 

 

Resistance Bar (67), the 20-pound Removable

 

 

 

 

 

 

 

Resistance Bar (36), an 80-pound Resistance Bar

Rings on

 

 

 

 

 

96

(95), the 10-pound Center Resistance bar (44), an

 

 

 

 

 

 

this side

 

 

44

 

 

 

80-pound Resistance Bar (95), and the 40-pound

 

 

 

 

 

 

 

 

 

 

 

 

 

Resistance Bar (96). Make sure the indicated

 

4

35

 

 

 

95

rings are on the side shown and the arrows

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

point toward the Tray.

 

 

18

 

 

 

95

 

 

18

 

 

 

36

Orient the Cover Plate (72) as shown with the

 

 

Rods

 

67

 

 

 

 

 

back facing away from the Lat Tower (4). Attach

17

 

 

 

 

 

 

the Cover Plate to the Tray (35) with two M8 x

 

 

 

 

 

 

 

 

 

 

 

 

 

19mm Button Head Screws (86).

 

 

 

 

 

 

 

 

 

 

 

 

 

80

71

17. Locate the Long Cable (80). Insert one end of

 

 

 

 

 

 

 

 

 

 

 

11

 

the Cable through the welded tube on the indicat-

 

 

 

 

 

104

 

 

 

 

 

 

ed end of the Cross Tube (11) and then through a

 

 

 

 

 

 

 

 

 

 

 

 

 

Swivel Arm (22). If necessary, use the tip of a

 

 

 

 

 

 

22

screwdriver to pull the end of the Cable out of the

 

 

 

28

 

 

 

 

 

 

 

 

Swivel Arm. Make sure the Cable is on the indi-

 

 

 

 

 

 

 

 

 

 

 

 

 

cated side of the welded rod in the Swivel Arm.

 

 

 

 

 

 

Rod

Insert the Swivel Arm (22) into the welded tube

 

 

 

 

 

 

76

 

 

 

 

 

 

 

on the Cross Tube (11). Secure the Swivel Arm

 

 

 

 

 

 

 

with an M4 x 5mm Screw (104).

 

 

 

 

 

 

 

Wrap the Long Cable (80) around a 90mm Pulley

18

 

 

 

 

 

 

(28). Attach the Pulley inside of the Swivel Arm

 

 

Flat

 

 

 

 

 

 

 

 

 

(22) with an M10 x 42mm Button Head Bolt (71)

 

 

 

Edge

29

76

and an M10 Nylon Locknut (76).

 

 

 

 

 

 

 

 

 

 

 

 

18. Wrap the Long Cable (80) around a 90mm Pulley

 

 

 

 

 

 

80

(28). Attach the Pulley and a Pulley Guard (29) to

 

 

73

 

 

 

 

 

 

 

 

28

the indicated M10 x 140mm Carriage Bolt (73)

 

 

 

 

 

 

with an M10 Nylon Locknut (76). Be sure the flat

 

 

 

 

 

 

 

edge of the Pulley Guard is on the side shown.

 

 

 

 

 

 

 

19. Attach a Pulley Housing (94) to the indicated “U”-

19

 

 

 

 

 

 

 

 

 

 

 

 

 

channel on the 10-pound Center Resistance Bar

 

 

 

 

 

 

 

(44) with an M10 x 102mm Button Head Bolt (24),

 

 

 

 

 

 

 

two Pivot Bushings (74), and an M10 Nylon

 

 

 

 

 

 

 

Locknut (76).

 

 

44

 

 

 

 

 

 

 

 

 

 

 

Wrap the Long Cable (80) around a 90mm Pulley

 

 

76

 

 

 

 

(28). Attach the Pulley inside of the Pulley

 

 

74

 

 

“U”-Channel

Housing (94) with an M10 x 42mm Button Head

 

 

 

 

76

 

Bolt (71) and an M10 Nylon Locknut (76).

 

 

71

 

 

 

 

 

 

94

 

 

 

 

 

 

 

 

 

 

28

74

 

 

 

 

 

 

 

 

 

 

 

 

 

80

 

24

 

 

 

 

 

 

 

 

10

Page 10
Image 10
Weider WESY5773.0 user manual Locate the Long Cable 80. Insert one end, Edge of the Pulley Guard is on the side shown