Weider WESY85290 manual Assembly, End of the Cable with the ball is on

Models: WESY85290

1 25
Download 25 pages 28.35 Kb
Page 10
Image 10

14. During steps 15 through 29, refer to the CABLE DIAGRAM on page 19 of this manual to verify proper cable routing. Before begin- ning this section, identify the Long Cable (23) and the Short Cable (58) by comparing the lengths of the cables.

IMPORTANT: While assembling the cables, do not overtighten the bolts and nuts securing the pulleys. The pulleys must be able to turn freely.

15. Locate the Long Cable (23). Route the Long

 

Cable around the indicated 3 1/2Ó Pulley (15)

 

attached to the Top Frame (55). Be sure that

 

the end of the Cable with the ball is on the

 

indicated side of the Pulley and that the

 

Cable is between the Pulley and the hook.

 

Tighten the 3/8Ó x 3 3/4Ó Bolt (71) and the 3/8Ó

 

Nylon Locknut (not shown).

ASSEMBLY

16. Wrap the Long Cable (23) around a ÒVÓ-Pulley

CABLE

(6). Attach the ÒVÓ-Pulley and a Long Cable

Trap (50) to the indicated bracket on the

 

Front Upright (42) with a 3/8Ó x 2 1/2Ó Bolt (7) and a 3/8Ó Nylon Locknut (21). Be sure that the Long Cable Trap is positioned to hold the Cable in place.

17.Route the Long Cable (23) around the ÒVÓ- Pulley (6) on the Left Arm (47). Be sure that the Cable is in the groove of the Pulley and that the Long Cable Trap (50) is posi- tioned to hold the Cable in place. Tighten the 3/8Ó x 2 1/2Ó Bolt (7) and the 3/8Ó Nylon Locknut (not shown).

10

14

 

 

 

23

 

 

 

58

 

 

 

15

 

 

23

 

55

 

 

 

 

 

 

15

 

Ball

71

 

 

Hook

 

 

16

 

7

 

 

 

 

 

 

6

50

 

 

 

 

 

42

 

 

 

 

23

 

21

 

 

17

6

7

50

 

23

 

47

 

 

 

 

Page 10
Image 10
Weider WESY85290 manual Assembly, End of the Cable with the ball is on, Indicated side of the Pulley and that