3.Press a 2” Inner Cap (27) into the Top Frame
(55). Press a 1 3/4” Inner Cap (44) into each end of the crossbar on the Top Frame. Press two Round Inner Caps (96) into the top of the crossbar.
Attach the Top Frame (55) to the Front Upright
(42)with two 5/16” x 2 3/4” Bolts (11), two 5/16” Washers (8), and two 5/16” Nylon Locknuts (3).
Attach the Top Frame (55) to the VKR Upright
(74)and the Squat Upright (56) with two 5/16” x 2 3/4” Bolts (11) and two 5/16” Nylon Locknuts (3).
Tighten all of the Nylon Locknuts (3) used in steps 1–3.
4.Set two Weight Bumpers (19) on the bracket on the Base (4) as shown. Set two Weight Bumpers on the bracket on the Stabilizer (5).
Stack eight Weights (25) onto each set of Weight Bumpers (19). Be sure that the pin grooves are all on the same side of each stack of Weights.
Be careful not to tip either stack of Weights
(25)until step 6 is complete.
5.Press a Weight Tube Bumper (64) into the end of a Weight Tube (63). Insert the Weight Tube into the front stack of Weights (25). Be sure that the pins on the Weight Tube are sitting in the pin grooves in the top Weight (refer to step 4).
Lubricate the inside of the holes in a Top Weight
(65).Set the Top Weight onto the front stack of Weights (25). Insert both Long Weight Guides
(62)into the stack of Weights. Be sure that the holes in the Weight Guides are at the top, as shown.
7
3 |
| 11 |
|
|
|
|
|
| |
| 55 | 3 | 8 | 96 |
| 27 | |||
|
|
|
| |
|
|
|
| 44 |
|
|
|
| Crossbar |
|
|
|
| 44 |
| 11 |
| 3 |
|
|
|
|
| |
|
| 56 | 42 |
|
| 74 |
|
| |
|
|
|
| |
4 |
| Pin |
|
|
| 25 | Grooves |
|
|
|
|
|
| |
|
| 25 |
| Pin |
|
|
|
| |
|
|
|
| Grooves |
| 19 |
|
|
|
| Bracket |
| 19 |
|
|
|
|
| |
| 5 |
|
|
|
|
| Bracket | 4 |
|
|
|
|
| |
5 |
|
|
|
|
| Holes |
| 62 |
|
|
|
|
| |
| Lubricate |
|
|
|
| 65 | Pin |
| |
|
|
|
| |
|
| 63 |
|
|
|
|
| 64 |
|
|
|
| 25 |
|