Weil-McLain 550-141-829/1201 Check-OutProcedure, Check off steps as completed, maintenance person

Models: 550-141-829/1201

1 32
Download 32 pages 63.75 Kb
Page 26
Image 26
Check-Out Procedure

Check-Out Procedure

Check off steps as completed:

1. Boiler properly filled with water?

2. Boiler piping checked for leaks (including tankless heater, if used)?

3. System vents operating properly?

4. Boiler properly skimmed?

5. Air purged from oil piping? Piping checked for leaks?

6. Flue cap in place and tightened? Burner door closed, sealed and nut tight? Burner plugged in and service switch on?

Obtain gas-tight seal to prevent possible flue gas

leakage and carbon monoxide emissions, leading to severe personal injury or death.

7. Proper draft and burner flame? Final adjustment made with combustion test equipment?

8. Test pressure control: While burner is operating, move indicator on limit control below actual boiler steam pressure. Burner should go off. Raise setting on pressure control above steam pressure and burner should re-ignite.

9. Test low water cutoff(s): Follow control manufacturer’s instructions for testing procedures. Make sure burner goes off when control responds to low water condition. Burner should re-ignite when proper water level is restored.

10. Test additional field-installed controls: If boiler has additional operating control or other controls, test for operation as outlined by control manufacturer. Burner should be operating and should go off when controls are tested. When controls are restored, burner should re-ignite.

11. Limit control set to system

pressure requirements?

12. Thermostat heat anticipator setting (if available) set properly? Refer to “Connect wiring,” page 19.

13. Boiler cycled with thermostat? Raise to highest setting and verify boiler goes through normal start-up cycle. Lower to lowest setting and verify boiler goes off.

14. Observed several operating cycles for proper operation?

15. Set room thermostat(s) to desired

room temperature?

16. Completed Installation and Service Certificate below?

17. Reviewed Maintenance and Service Manual with owner or maintenance person and instructed person to keep for future reference?

18. Returned all instructions provided with boiler to its envelope and placed with boiler for future reference?

Installation and Service Certificate

Date Installed: ______________________________________________

Boiler Model Number: __________________Series: _________

CP Number(s):______________________________________________

Installation instructions have been followed.
Check-out procedure has been performed.
Above information is certified to be correct.

Measured Btu or GPH Input: _____________________________

Information received and left with owner/

 

maintenance person.

 

Installer:__________________________________________________________________________________________________________________________

(Company)
(Address)
(Phone)

26

 

 

_________________________________________________________________

(Installer’s Signature)
Page 26
Image 26
Weil-McLain 550-141-829/1201 Check-OutProcedure, Check off steps as completed, Installation and Service Certificate, Phone