1e Prepare boiler location — air openings

GOLD CGa Gas-Fired Water Boiler — Boiler Manual

1e Prepare boiler location — air openings

#OMBUSTION AIRI OPENINGN LOCATION ANDN SIZING REQUIREMENTS DEPEND ON THEHCLEARANCESAAROUND

THEHBOILER #HECKETHEHBOILER PLACEMENTECOMPARED

to Figure 1a, page 7.

)F ALLLCLEARANCESAARERAT LEASTAEQUALUTO &IGURE A PAGEE, apply the sizing and placement of openings given on pages 10 and 11.

)F !.9.CLEARANCE IS LESS THAN &IGURE A PAGEE, you must provide air openings sized and located as shown in Figure 1b, page 7. $/ ./4 apply the sizing and location information shown on page 10 or 11.

Air openings must be provided

#OMBUSTION AIRIANDNVENTILATIONLOPENINGS MUST COMPLY THEH.ATIONALL&UEL 'ASA#ODE !.3) :LATESTEDITION OR APPLICABLE LOCALCBUILDING CODES #ANADIAN INSTALLATIONSLMUST COMPLY WITH " OR " )NSTALLATION #ODES

Provide adequate combustion and ventilation air to assure proper combustion and reduce the risk of severe personal injury, death or substantial property damage caused by flue gas spillage and carbon monoxide emissions.