GOLD CGa Gas-Fired Water Boiler — Boiler Manual

2a Prepare boiler — placement and setup

Place boiler/crate near position

1.,EAVE BOILEROIN CRATE AND ON PALLET until installa- tion site is ready.

2.Move entire crate and pallet next to selected loca- tion.

3.Remove crate. ,EAVE BOILEROON PALLET

4.Remove boiler from pallet as follows:

a.Tilt left side of boiler up and place a board under left legs.

b.Tilt boiler the other way and place a board under right legs.

c.Slide boiler backwards off pallet and into posi- tion.

$O NOTODROP BOILER OR BUMP JACKET ON mOOR OR PALLETL$AMAGE TO BOILER

can result.

 #HECKELEVEL

a.Shim legs, if necessary.

B $O NOT ALTER LEGS

Inspect orifices and burners

1.Remove front jacket door. Remove base access panel (See &IGURE , item , page 62).

 #HECKE FORO CORRECTLYSIZED MANIFOLD ORIlCES 3EEE 4ABLE  below for sizing. (The orifice size is stamped on the orifice spud barrel.)

4ABLE  Manifold orifice sizing

Location

Natural gas

 

 

 

U. S.

0-2,000 ft

over 2,000 ft

2.00 mm

(Note 1)

 

Canada

0-2,000 ft

2,000-4,500

 

2.00 mm

1.90 mm

 

 

 

Location

Propane gas

 

 

 

U. S.

0-2,000 ft

over 2,000 ft

1.30 mm

(Note 1)

 

Canada

0-2,000 ft

2,000-4,500

 

1.30 mm

1.20 mm

 

 

 

Note 1: For elevations above 2,000 feet, contact your local Weil-McLain sales office for details.

#ORRECTLYSIZEDL MANIFOLD ORIFICES

must be used. Failure to do so will result in severe personal injury, death or substantial property dam- age.

3. Level and straighten burners.

"URNERSNMUST BE PROPERLY SEATED IN slots in burner rest with their open- ings face up. Main burner orifices must inject down center of burner. Failure to properly seat burners will result in severe personal injury, death or substantial property dam- age.

4. Reinstall access panel.

$O NOTOOPERATERBOILER WITHOUTHAC- cess panel secured in place. Failure to comply could cause momentary flame rollout on ignition of main flame, resulting in possible fire or personal injury hazard.

Orifice replacement procedure

(when required)

1.Remove access panel.

2.On gas manifold, mark location of main burner with attached pilot assembly.

3.Remove main burner with attached pilot assembly from manifold. Remove all remaining burners.

4.Remove and discard all main burner orifices in gas manifold.

5.Apply a small amount of pipe dope to each of the new orifices and install in the manifold. Make sure the orifices are aligned correctly, not cross-threaded in the manifold tappings.

Use only pipe dope compatible with propane gas, even if boiler is to be operated on natural gas. Failure to comply could result in severe per- sonal injury, death or substantial property damage.

6.Reinstall main burner with attached pilot assembly at location marked on gas manifold. Reinstall all remaining burners.

7.Follow check-out procedure, Section , page 33.

12

Part Number 550-101-009/0107

Page 12
Image 12
Weil-McLain CGA25SPDN 2a Prepare boiler placement and setup, Place boiler/crate near position, Inspect orifices and burners

CGA25SPDN specifications

The Weil-McLain CGA25SPDN is a high-efficiency gas-fired boiler designed to deliver dependable heating performance while maintaining a strong focus on energy savings and user-friendly operation. Ideal for residential applications, this boiler is engineered to provide consistent warmth and comfort in homes with various heating demands.

One of the main features of the CGA25SPDN is its durable construction. Built with high-quality materials, this boiler is designed to withstand the rigors of frequent operation while maximizing longevity. It features an advanced cast iron heat exchanger that efficiently transfers heat to the water, resulting in lower energy costs and improved overall performance.

Efficiency is a key characteristic of the Weil-McLain CGA25SPDN. Its design promotes efficient combustion, allowing for a higher Annual Fuel Utilization Efficiency (AFUE) rating. With an AFUE rating of up to 82%, this boiler ensures that more of the fuel used is converted into usable heat, which translates to reduced energy bills for homeowners.

The boiler exhibits a user-friendly control system that allows for easy operation and maintenance. It comes equipped with an integrated vent damper that maximizes efficiency by reducing heat loss during standby periods. Additionally, the CGA25SPDN features an adjustable thermostat, enabling homeowners to customize their heating preferences easily.

Another significant feature of the CGA25SPDN is its versatility. The boiler is compatible with various heating applications, including hot water heating systems and home heating configurations. This adaptability makes it a great choice for both new installations and retrofitting existing systems.

Safety is always a concern with gas-fired appliances, and the Weil-McLain CGA25SPDN addresses this through its advanced safety mechanisms. The boiler incorporates safety controls that prevent overheating and ensure proper operation, providing peace of mind to homeowners.

In summary, the Weil-McLain CGA25SPDN stands out as a reliable and efficient heating solution for residential settings. With its durable construction, high-efficiency performance, user-friendly controls, and impressive safety features, it is an exceptional choice for those seeking a dependable gas-fired boiler that meets modern heating demands while keeping energy costs in check. Homeowners can trust the Weil-McLain CGA25SPDN for warmth and comfort through the cold months.