Weil-McLain CGA25SPDN manual 6a Start-up- preparation continued, Fill the system with water

Models: CGA25SPDN

1 68
Download 68 pages 27.39 Kb
Page 29
Image 29
6a Start-up — preparation (continued)

GOLD CGa Gas-Fired Water Boiler — Boiler Manual

6a Start-up — preparation (continued)

Fill the system with water

 #LOSEOMANUAL AND AUTOMATIC AIRIVENTS and boiler drain cock.

2.&ILL TO CORRECTRSYSTEM PRESSURE #ORRECTRPRESSURE WILL VARY WITH EACH application. Typical cold water fill pressure for a residential system is 12 psi.

3.0URGEEAIR from system:

A #ONNECTNAAHOSE TO THEHPURGERVALVELSEE drain valves, item , in sug- gested piping diagrams on pages 17 through 23, &IGURE  through &IGURE ). Route hose to an area where water can drain and be seen.

B #LOSEOTHEHBOILER OR SYSTEM ISOLATIONAVALVELBETWEENWTHEHPURGE VALVEL and fill connection to the system.

C #LOSEOZONE ISOLATION VALVES

d.Open quick-fill valve on cold water makeup line.

e.Open purge valve.

f.One zone at a time, open the isolation valves. Allow water to run through the zone, pushing out the air. Run until no noticeable air mOWOIS PRESENT #LOSEOTHEHZONE ISOLATIONAVALVES ANDNPROCEEDCWITHHTHEH next zone. Follow this procedure until all zones are purged.

G #LOSEOTHEHQUICKlLLKWATERTVALVELANDNPURGERVALVELANDNREMOVE THE hose. Open all isolation valves. Watch that system pressure rises to correct cold-fill pressure.

h.After the system has operated for a while, eliminate any residual air by using the manual air vents located throughout the system.

i.If purge valves are not installed in system, open manual air vents in

SYSTEM ONENAT AATIME MBEGINNINGNWITH LOWEST mOORO#LOSEOVENT WHEN water squirts out. Repeat with remaining vents.

4.Open AUTOMATICMAIRIVENT (diaphragm-type or bladder-type expansion tank systems only) one turn.

5.Open other vents:

a.Starting on the lowest floor, open air vents one at a time until water squirts out.

b.Repeat with remaining vents.

6.Refill to correct pressure.

Inspect system water piping

After filling the boiler and system with water, INSPECTPALL PIPING throughout the system for leaks. If found, repair immediately. Repeat this inspection after the boiler has been started and the system has heated up.

,EAKSAMUSTSBE REPAIRED AT ONCE

Failure to do so can damage the boiler, resulting in substantial prop- erty damage.

$O NOTO USES PETROLEUMBASED

CLEANINGN OR SEALINGL COMPOUNDS in boiler system. Severe damage to boiler will occur, resulting in sub- stantial property damage.

Inspect base insulation

The boiler contains ceramic fiber and fiberglass materials. Use care when handling these materials per instructions on PAGE  of this manual. Failure to comply could result in severe personal injury.

&AILURE TO REPLACE damaged insu- lation or reposition insulation can result in a fire hazard, causing severe personal injury, death or substantial property damage.

#HECKETO MAKE SURE BASE INSULATION IS SECURE against all four sides of the base. If insulation is damaged or displaced, DO NOT operate boiler. Replace or reposition insulation.

Part Number 550-101-009/0107



Page 29
Image 29
Weil-McLain CGA25SPDN manual 6a Start-up- preparation continued, GOLD CGa Gas-FiredWater Boiler - Boiler Manual