II Piping connections
Connect steam (water) piping to the boiler per EGH Manual Section II.
Water boilers — make provision for mounting probe low water cutoff in the supply or return piping, above the top of the boiler. The low water cutoff must be between the boiler and any isolation valve(s).
III Install boiler controls — water boilers
|
|
|
| The controls may be mounted on either end of the boiler. Mount all controls | ||
|
|
|
| on the same end. The junction box (electrical entrance) must also be mounted | ||
|
|
|
| on the same end as the controls. |
| |
|
|
|
| Install the probe low water cutoff in the supply or return piping, above the | ||
|
|
|
| top of the boiler. The low water cutoff must be mounted between the boiler | ||
|
|
|
| and any isolation valve(s) installed in the piping. |
| |
|
|
| Install water trim components as required by ASME | |||
|
|
| Table 2 for controls required and tapping usage. See Figure 6 for finished assembly. | |||
|
|
| Plug all unused tappings. |
|
| |
|
|
| All piping and control connections must also comply with the EGH Manual. | |||
Figure 3 |
|
|
| Table 2 |
|
|
Water boiler connections |
|
| Water boiler connections |
| ||
| 11¾" | 275/8" |
| Tapping | Application | |
| 163/16" |
| ||||
|
|
|
|
| ||
|
|
|
| D | Boiler drain connection | — |
| E | G | Supply | E | ASME relief valve (per EGH manual) | — |
|
|
| L | G | Pipe to air vent or compression tank | — |
|
|
|
|
|
| |
|
|
| S | H | Honeywell | |
32¾" | Not |
| H | L | Pressure/temperature gauge | |
used |
| |||||
|
|
| ||||
|
|
|
| V |
|
|
|
|
|
| S | Temperature limit control, auto reset | |
|
| D |
| V | Gas supply connection (right or left) | — |
| 13½" |
|
| 165/8" |
|
|
| Return |
| McDonnell & Miller |
| ||
|
|
|
| |||
|
| Not shown | probe LWCO (Mount in supply or | |||
|
|
|
| |||
|
|
|
|
| return piping, above top of boiler) |
|
211/16" | 24" |
|
| Plug all tappings not used. |
| |
|
|
|
|
| ||
|
|
|
|
|
6 | Part Number |