AQUA PLUS
Wiring — zoning with circulators
Figure 18 Typical wiring — zoning with circulators — DHW priority with
Notes
•Also refer to the WMCR manual and
Boiler Zone Wiring Guide for further details.
•Refer to Wiring require- ments on page 20.
System piping
•Figure 7, page 11
•Figure 8, page 12
1. This drawing is conceptual |
|
only. It shows representa- |
|
tive components and wir- |
|
ing. |
|
represent that this drawing |
|
meets any particular me- |
|
chanical or building codes. |
|
The installer is respon- |
|
sible for inclusion of all |
|
required safety devices, or |
|
other miscellaneous pip- |
|
ing hardware not shown |
|
on drawing. The installer |
|
is responsible for proper |
|
sizing / selection of all |
|
hardware shown on this |
|
diagram. |
|
2. Follow component manu- |
|
facturer’s instructions for |
|
installation of all items |
|
shown. |
|
3. See boiler manual for spe- | GV90+ or Ultra gas boilers: |
cific details on installing | |
the boiler. | DO NOT apply the drawings in this manual. Refer only to the boiler manual. |
Part number | 21 |