INSTALLATION (continued)
CAUTION:
Hot Surface
Exposed surfaces can be hot to the touch and may cause burns.
INSTALLATION START-UP AND CHECKOUT
Before turning on power or water to
a.Unit is level, air outlet guard in place, with all legs touching the counter (countertop installation); or,
Wall brackets securely mounted to wall and unit properly and securely mounted to brackets (all screws tight) with outlet guard installed (wall mount installation).
b.All electrical connections properly made and tightened. Water connections properly made.
Turn on water to
Apply power to
a.POWER INDICATOR will glow when POWER SWITCH is ON. TANK INDICATOR will glow when tank is properly installed.
b.After a five second delay,
c.During initial tank fill, CAREFULLY separate the tank from the
d.Reinstall the water tank. Verify that water flow stops when water reaches the water level probe.
Press power switch to OFF. Discard all water generated thus far by dispensing containers of water from the faucet until the tank is empty.
Remove the tank from the shelf. Install tank lid on tank.
Press power switch to ON. Reinstall tank on
Test water temperature at faucet. Water should be at 201ºF.
8