4.Pull left curtain (D) out until it fits into the window channel (E). Repeat with right curtain.
5.Insert one of the slotted
Top view
E
D
G
F
D
E
F
Completing installation
NOTE: Install
1. Place
window and against upper window sash (I).
H
I
2. Use a 3/32 in. drill bit to drill a starter hole through the hole in the bracket.
3.Attach
JK
4. Insert foam seal (J) behind the top of the lower window sash (K) and against the glass of the upper window.
5. Plug power cord into outlet.
7