Copies of the standards listed may be obtained from:
National Fire Protection Association
One Batterymarch Park
Quincy, Massachusetts 02269
INSTALLATION
INSTRUCTIONS
Unpack the Air Conditioner
WARNING
Excessive Weight Hazard
Use two or more people to move and install air conditioner.
Failure to do so can result in back or other injury.
Remove packaging materials
■Remove and properly dispose of packaging materials. Remove tape and glue residue from surfaces before turning on the air conditioner. Rub a small amount of liquid dish soap over the adhesive with your fingers. Wipe with warm water and dry.
■Do not use sharp instruments, rubbing alcohol, flammable fluids, or abrasive cleaners to remove tape or glue. These products can damage the surface of your air conditioner.
Prepare Air Conditioner for Installation
Install side curtains
NOTE: Attach curtains to unit before placing unit in window.
1.Remove unit from packaging.
2.Locate provided bag of 6 screws.
3.Insert top and then bottom of right curtain housing in top and bottom curtain guides on air conditioner.
Top view
12
1.Curtain housing
2.Curtain guides on air conditioner
Bottom view
1
2
1.Curtain housing
2.Curtain guides on air conditioner
4.Extend right curtain outward so you may insert a #8 x ³⁄₄ in.
NOTE: This screw is required to correctly attach curtain (top to bottom) to the air conditioner cabinet.
5.While the right curtain is still extended, insert screw in the top and bottom slots of the curtain. Using #8 x ³⁄₈ in.
6.Slide the curtain housing into the guides as far as it will go.
7.Repeat above steps for the left curtain.
5