Wibur Curtis Company SD2 specifications Important Safeguards/Conventions, Setup Steps

Models: SD2

1 8
Download 8 pages 30.55 Kb
Page 1
Image 1
FIND OUT MORE

FIND OUT MORE

ON THE WEB

WWW.WILBURCURTIS.COM

Models Included

SD2

WARNING HOT LIQUID,

Scalding may occur.

Avoid splashing.

CAUTION: Please use this setup procedure before attempting to use

this appliance. Failure to follow the instructions can result in injury or

the voiding of the warranty.

CAUTION: DO NOT connect this unit to hot water. The inlet valve is

not rated for hot water.

WILBUR CURTIS COMPANY

Montebello, CA 90640

ISO 9001 REGISTERED

ISO 9001 REGISTERED WILBUR CURTIS COMPANY, INC.

Soluble Dispensing System Instructions

Important Safeguards/Conventions

This appliance is designed for commercial use. Any servicing other than cleaning and maintenance should be performed by an authorized Wilbur Curtis service center.

Do NOT immerse the unit in water or any other liquid

To reduce the risk of fire or electric shock, do NOT open top panel. No user serviceable parts inside. Repair should be done only by authorized service personnel.

Keep hands and other items away from hot parts of unit during operation.

Never clean with scouring powders or harsh implements.

Conventions

WARNINGS – To help avoid personal injuryImportant Notes/Cautions – from the factory

Sanitation Requirements

Your Curtis Café System is Factory Pre-Set and Ready to Go… Right from the Carton.

Following are the Factory Settings for your Soluble Delivery System:

Tank Temperature = 190°F

Flavor Controls= Set at 50%

Dispensing Mode Set for Manual Dispensing

Generally there will never be a reason to change your SD2 programming. However, should you need to make slight adjustments to meet your dispensing needs, programming instructions are provided later in this manual.

System Requirements:

Water Source 20 – 90 PSI (Minimum Flow Rate of 1 GPM)

Electrical: See attached schematic for standard model or visit www.wilburcurtis.com for your model. Equipment to be installed to comply with applicable federal, state, or local plumbing/electrical codes having jurisdiction.

SETUP STEPS

The unit should be level (left to right and front to back), located on a solid counter top. Connect a water line from the water filter to the brewer. NOTE: Some type of water filtration device must be used to maintain a trouble-free operation. (In areas with extremely hard water, we suggest that a sedimentary and taste & odor filter be installed.) This will prolong the life of your dispensing system and enhance coffee quality.

The National Sanitation Foundation requires the following water connection:

1.A quick disconnect or additional coiled tubing (at least 2x the depth of the unit) so that the machine can be moved for cleaning underneath.

2.In some areas an approved backflow prevention device may be required between the brewer and the water supply.

1.Connect a water line from your facility to the 1/4” flare water inlet fitting of the valve, behind the machine. Water volume going to the machine should be stable. Use tubing sized sufficiently to provide a minimum flow rate of one gallon per minute.

2.Plug the power cord into an electrical outlet rated at 20A.

3.Switch on the toggle switch, behind the unit, that runs power to the components in the machine. The lights (display window and row of buttons) on the front door will activate and the heating tank will start to fill.

4.Water in the heating tank will require about 30 minutes to reach operating temperature (factory setting of 190°F). At this time the READY LED will light.

5.Remove and fill the canisters with soluble coffee mixes.

OPERATION INSTRUCTIONS

1. Select one of the coffee dispense buttons.

2. Place your cup beneath the spout of the desired coffee flavor.

2. Push and hold the dispensing button for this coffee selection.

3. Release the button when the cup is 2/3 full.

FILL CANISTERS DAILY

1.Open the front door to access the coffee canisters.

2.The canisters must be removed from the unit for filling. Turn the product delivery elbows upward.

3.Reposition the canisters on the machine, turning the product delivery elbows downward and aligning the gear socket with the motor shaft.

FOR THE LATEST SPECIFICATIONS AND INFORMATION GO TO

1

WWW.WILBURCURTIS.COM

Page 1
Image 1
Wibur Curtis Company SD2 specifications Important Safeguards/Conventions, Setup Steps, Operation Instructions