MACHINE OPERATIONS
PRE-RUN MACHINE INSPECTION
Do a
NOTE: See maintenance section for
FILLING SOLUTION TANK
FOR SAFETY: Before leaving or servicing machine; stop on level surface, turn off machine.
1.Turn the machine off.
2.Remove solution tank cover.
3.Fill the solution tank with clean water, leaving enough room for the required amount of cleaning solution. The solution tank capacity is 8 gallons (30.3 liters). The water must not be hotter than 140° F (60°C) to prevent damage to the tank.
4.Measure the chemical into the solution tank. Liquid chemicals should be added to the solution tank after filling with water. Dry chemicals should be thoroughly mixed before being added into the solution tank. Commercially available, high alkaline floor cleaners are suitable for use in the solution system.
NOTE: Read the chemical manufacturers recommended proportion instructions.
5.Replace solution tank cover.
Flammable materials can cause an explosion or fire. Do not use flammable materials in the tanks.
NORMAL SCRUBBING
Plan the scrubbing pattern in advance. The longest track is around the perimeter of the area to be cleaned. For efficient operation, the runs should be the longest possible without turning, stopping, or raising and lowering scrub brush/squeegee.
NOTE: In order to achieve the best possible results, the area that is to be cleaned should be swept before scrubbing. Large debris, strings & wire must be removed to prevent being caught in the brush or squeegee.
86221970 17” SCRUBBER 01/03/07 |