INSTALLATION I N S T R U C T I O N S
INTERNAL B L O W E R |
|
IMPORTANT NOTE: Refer to the installation | IMPORTANT NOTE: Before turning the power |
instructions provided with the internal | on to the ventilation hood liner, make sure the |
blower for additional mounting and wiring | blower is off. |
instructions. | IMPORTANT NOTE: Use wire connectors or |
|
wire nuts approved by UL or C/UL.
L B L O W E R - 1 2 0 I N T I N S TA L L AT I O N
Slide the blower mounting tab into the hood liner top plate mounting slot. Make sure the blower tab and mounting slot are aligned properly front to back.
Secure the blower with the weld stud at the front of the blower and hood liner top plate with the nut (included with the blower).
Verify that the blower discharge aligns with the top plate discharge
Once the hood liner installation is complete, plug the blower power cord(s) into recepta- cle(s) located near the center of the hood liner shell. Use the clips on the interior of the hood liner to keep excess power cord away from moving parts.
| Mounting |
| Slot |
Weld Stud |
|
Blower |
|
Housing | Mounting |
| Tab |
| Liner |
| Top and |
| Back Plate |
Nut |
|
Internal blower installation
Dimensions in parentheses are in |
|
millimeters unless otherwise specified. | 11 |