SUB-FRAME & BACKHOE to TRACTOR Cont.
Attach Top Link
1.Assemble inner top link (2), 1” hex nut (1), and outer top link (3).
2.Attach top link (inner link end) to backhoe main- frame with 1.0 x 4.5 clevis pin (4) and klik pins (5) as shown in Figure 14.
3.Adjust top link as necessary to fit between the backhoe mainframe and tractor top link bracket.
4.Attach outer link end to tractor top link bracket using original tractor top link pin as shown in Figure 15.
5.Tighten 1” hex nut (1).
1.3132 1” Hex nut
2.38645 Inner Top Link
3.1001579 Outer Top Link
4.45087 1.0 x 4.5 Clevis Pin
5.62043 1/4 x
6.
7.
$WWDFK WR WUDFWRU
Figure 14 Top Link to Backhoe Installation
Figure 15 Top Link to Tractor Installation (Typical Installation)
$WWDFK WR EDFNKRH
Figure 13 Top Link Assembly
12 INSTALLATION | MAN0047 (9/15/00) |
|