![](/images/new-backgrounds/1096094/9609481x1.webp)
SAFETY LIGHT INSTALLATION
1.Remove all components from shipping carton. Make sure that all required hardware is included.
2.Attach dual safety lights (Figure 48) to safety light mounting brackets (9) using cap screws (17) and lock nuts (18).
NOTE: Make sure that light lenses are in the cor- rect position in relation to direction of equipment travel: amber lenses on the outside, red lenses on the inside facing rear of shredder.
3.Install light bracket (5) on end of shredder using cap screws (26) and lock nuts (25) on top of end sheet.
4.Attach light mounting brackets (9) to light bracket
(5)using pins (16).
5.Secure SMV sign (8) to light bracket (5).
6.Plug ends of wiring harness into corresponding plugs of the light units
NOTE: Left side of wishbone harness is labeled “Left”.
7.Run wiring harness along top of shredder and secure with enclosed
(29)approximately every two feet.
8.Secure wiring harness module to top of shredder using self tapping screw (30).
9.Connect
5.Light Assembly Mounting Bracket
8.SMV Sign
9.Safety Light Mounting Bracket
11.Dual Lamp - Left Hand
12.Dual Lamp - Right Hand
16.Pin
17.1/4 Flange Lock Nut
18.1/4 NC x 1 HHCS
26.1/2 NC x
29.Adhesive backed clamps
30.5/16 NC x 3/4 Self Tap Screw
Figure 48. Safety Light Installed
Wiring Harness
DP127
Figure 49. Safety Light Wiring
MAN0943 (07/12/2011) | Assembly 41 |
|
|