D('*0()$Jg\\[;i`ccGi\jj
?\X[jkfZb
The headstock must be mounted on the column/base assembly before the drill press can be operated. Moving and installing the headstock is a
Kfdflekk_\_\X[jkfZbfekfk_\Zfclde#[fk_\j\ jk\gj1
(% Set the top piece of the headstock styrofoam pack- ing approximately six feet away from the column/ base assembly.
)% Remove the headstock from the box and place it on the styrofoam packing piece you laid out in Jk\g(.
Efk\1 KfXmf`[[XdX^`e^k_\dXZ_`e\#Y\ZXi\]lc efkkf_fc[k_\_\X[jkfZbYpk_\jn`kZ_fik_\kfg gXikf]k_\Y\ckZfm\in_\ec`]k`e^%
*% Carefully lay the column/base on its side.
+% Slide the column all the way into the bottom of the headstock (approximately
,% Tilt the entire assembly up (see =`^li\(+) and carefully position the drill press on its base in the fully upright position.
.% Center the headstock directly over the base as indi- cated by the plumb bob and ruler.
/% Tighten the two headstock setscrews to the column, as shown in
=`^li\(+% Mounting the headstock.
=`^li\(,% Aligning headstock with base.
J<KLG