Xantrex Technology TFB110 Installation continued, Cable Installation into Fuse Block continued

Models: TFB200 TFB110 TFB300 TFB110C TFB200C TFB300C TFB350 TFB400 TFB350C TFB400C

1 20
Download 20 pages 8.77 Kb
Page 8
Image 8
Installation (continued)

Installation (continued)

Cable Installation into Fuse Block (continued)

For Fuse Blocks designed for Ring-lugged Battery Cables (TFBxxx)

NOTE: Do not place anything between the ring-lug on the battery cable and the terminal surface.

A.If necessary, install the ring-lugs (not supplied) onto the battery cables. Ensure the terminal connector’s have a 3/8" diameter opening for placement over the stud connector on the fuse block.

1.Remove the 3/8" hex nut and split washers from the fuse block.

2.Place the cable ring lugs over the 3/8-18 bolt on the fuse block assembly and reinstall the split washer and hex nut.

Cable Installation into Fuse Block (continued) See Figure 4.

3.Tighten the hex nuts to 10-15 ft/lbs.

4.Repeat Steps 2, 3, and 4 for connection to the other end of the fuse block.

3/8-18

3/8-18

bolt

bolt

 

hex nut

Ring-lug on

Battery Cables

Terminal surface

split-split-

washerswashers

hex nut

Ring-lug on

Battery Cables

Terminal surface

Figure 4

Installation for Ring-lugged Battery Cables

8

©2002 Xantrex Technology Inc. All Rights Reserved

P/N 973-0019-01-02 Rev A 06/2002

Page 8
Image 8
Xantrex Technology TFB110, TFB400C, TFB350 Installation continued, Cable Installation into Fuse Block continued, See Figure