Installation (continued)
Cable Installation into Fuse Block (continued)
For Fuse Blocks designed for Ring-lugged Battery Cables (TFBxxx)
NOTE: Do not place anything between the
A.If necessary, install the
1.Remove the 3/8" hex nut and split washers from the fuse block.
2.Place the cable ring lugs over the
See Figure 4.
3.Tighten the hex nuts to
4.Repeat Steps 2, 3, and 4 for connection to the other end of the fuse block.
bolt | ||
bolt | ||
|
hex nut
Battery Cables
Terminal surface
split-split-
washerswashers
hex nut
Battery Cables
Terminal surface
Figure 4
Installation for Ring-lugged Battery Cables
8 | ©2002 Xantrex Technology Inc. All Rights Reserved |
P/N