York D2NA060 Table Of Contents, Troubleshooting, Tables, Installation, Sequence Of Operation

Models: D1NA018 D2NA060

1 21
Download 21 pages 63.06 Kb
Page 2
Image 2
TABLE OF CONTENTS

035-18265-001-A-0202

TABLE OF CONTENTS

General

1

 

 

 

 

TROUBLESHOOTING

 

Inspection

1

 

 

 

 

 

Troubleshooting Chart

15

Replacement Parts

1

 

 

 

 

 

 

 

 

 

Approvals

1

 

 

 

 

 

TABLES

 

Nomenclature

2

 

No.

 

 

 

 

 

 

 

 

 

 

Description

 

 

INSTALLATION

 

Page

 

 

 

 

 

 

Limitations

3

1

 

Units Application Data

3

Location

3

 

2

 

Natural Gas Application Data

5

Rigging and Handling

3

 

3

 

LP Gas Application Data

5

Clearances

3

 

Ductwork

3

4

 

Natural Gas Pipe Sizing

5

Roof Curb

4

5

 

LP Gas Pipe Sizing

5

Filters

4

 

6

 

Physical Data

6

Condensate Drain

4

 

7

 

Unit Weights

7

Service Access

4

 

Thermostat

4

8

 

Electrical Data

7

Power and Control Wiring

4

 

 

 

 

 

 

 

 

 

Compressors

4

9

 

Gas Rate - Cubic Feet Per Hour

11

Combustion Discharge

5

 

10

 

Superheat Charging Table, 018

13

Gas Piping

5

 

Gas Connection

5

11

 

Superheat Charging Table, 024

13

Flue Vent Hoods

6

12

 

Superheat Charging Table, 030

13

 

 

 

 

SEQUENCE OF OPERATION

 

13

 

Superheat Charging Table, 036

13

Heating

9

14

 

Superheat Charging Table, 042

14

Cooling

9

15

 

Superheat Charging Table, 048

14

Circulating Fan

9

 

16

 

Superheat Charging Table, 060

14

 

 

 

 

START-UP

 

 

 

 

 

 

FIGURES

 

Pre-start Check List

9

 

 

 

 

 

 

Operating Instructions

9

 

No.

 

 

 

Description

 

 

 

 

 

 

 

 

To Turn Off Gas To Unit

9

Page

 

 

 

 

 

 

Post-Start Check List (Gas)

9

1

 

Field Wiring Diagram

4

Manifold Gas Pressure Adjustment

10

 

2

 

External Supply Connection

5

Burner Instructions

10

 

3

 

Flue Vent Hood

6

Hot Surface Pilot Instructions

10

 

Adjustment of Temperature Rise

11

4

 

Center of Gravity

7

Checking Gas Input

11

5

 

Dimensions and Clearances

8

Secure Owner's Approval

11

 

6

 

Gas Valves

10

 

 

 

 

MAINTENANCE

 

7

 

Proper Flame Adjustment

10

Normal Maintenance

12

8

 

Ignitor and Flame Sensor Assembly

10

Cleaning Flue Passages and Heating Elements

............. 12

 

9

 

Typical Wiring Diagram, (208/230-1-60)

16

 

 

 

 

 

 

 

10

 

Typical Wiring Diagram, (208/230-3-60)

16

 

 

 

11

 

Typical Wiring Diagram, (460-3-60)

17

 

 

 

 

 

 

 

 

 

 

 

NOMENCLATURE

 

 

 

 

 

 

PRODUCT CATEGORY

D = Single Package

Air Conditioner

PRODUCT GENERATION

1 = 1st Generation

2 = 2nd Generation

PRODUCT IDENTIFIER

NA = 10 SEER

Gas Heat / Electric Cool

2

 

D

 

1

 

N

A

 

0

2

 

4

 

N

 

0

3

6

 

 

0

6

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

VOLTAGE CODE

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

06 = 208/230-1-60

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

25 = 208/230-3-60

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

NOMINAL COOLING

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

46 = 460-3-60

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

CAPACITY (MBH)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

58 = 575-3-60

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

018 = 18,000 BTUH

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

FACTORY

 

 

 

 

 

NOMINAL GAS HEATING

 

 

024 = 24,000 BTUH

 

 

 

 

 

 

 

 

 

 

030 = 30,000 BTUH

 

 

INSTALLED

 

 

 

 

 

 

OUTPUT CAPACITY

 

 

 

 

 

 

 

 

 

 

 

 

036 = 36,000 BTUH

 

 

 

GAS HEAT

 

 

036 = 36,000 BTUH

065 = 65,000 BTUH

 

 

042 = 42,000 BTUH

 

 

N = Natural Gas

 

 

056 = 56,000 BTUH

090 = 90,000 BTUH

 

 

048 = 48,000 BTUH

 

 

 

072 = 72,000 BTUH

110 = 110,000 BTUH

 

 

 

 

 

 

Heat Installed

 

 

 

060 = 60,000 BTUH

 

 

 

 

 

 

 

 

 

 

 

 

Unitary Products Group

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Page 2
Image 2
York D2NA060, D1NA018 Table Of Contents, Troubleshooting, Tables, Installation, Sequence Of Operation, Start-Up, Figures