York D3EG 036 frcetoonebetensioningatthe, 2Never, thedeflection, straightedgefrom, until, Defl

Models: D2EG 048 D2EG 060 D3EG 036

1 20
Download 20 pages 61.22 Kb
Page 15
Image 15
1Loosennut(D)fromthemotormount.

035-14832-003-A-0204

PILOT CHECKOUT

The pilot flame should envelope 3/8 inches of the end of the flame sensor. Refer to Figure 12. To adjust pilot flame, (1) remove pilot adjustment cover screw, (2) adjust the screw for the proper pilot flame, (3) be sure to replace cover screw after adjustment to prevent possible gas leakage.

FIG. 12 - PROPER FLAME ADJUSTMENT

Put the system into operation and observe through complete cycle to be sure all controls function properly.

BURNER INSTRUCTIONS

To check or change burners, pilot or orifices, CLOSE MAIN MANUAL SHUT-OFF VALVE AND SHUT OFF ALL POWER TO THE UNIT.

1.Remove the two screws holding either end of the manifold to the burner supports.

2.Open the union fitting in the gas supply line just upstream of the unit gas valve and downstream from the main manual shut-off valve.

3.Remove the gas piping patch plate.

4.Disconnect wiring to the gas valve and spark ignitor. Remove the manifold-burner gas valve assembly by lifting up and pulling back.

Burners are now accessible for service.

Reverse the above procedure to replace the assembly. Make sure that burners are level and seat at the rear of the heat exchanger.

BURNER AIR SHUTTER ADJUSTMENT

Adjust burner shutters so that a distinct, sharp, blue flame is obtained. Refer to Figure 13.

FIG. 13 - TYPICAL FLAME APPEARANCE

SUPPLY AIR AIR BLOWER AND TEMPERATURE RISE ADJUSTMENTS

The speed of the supply air blower will depend on the required CFM, the unit accessories and the static resistances of both the supply and the return air duct systems. With this information, the speed for the supply air blower can be determined from the blower performance and accessory static resistance data in Table 5 through 8.

Knowing the required blower RPM and the blower motor HP, the speed setting for the supply air motor can be determined.

The setting (turns open) for the optional belt-drive supply air motor pulley can be determined from Table 13.

TABLE 13 - BELT-DRIVE SUPPLY AIR

MOTOR PULLEY ADJUSTMENT

TURNS

BLOWER DRIVE RANGE (RPM)

OPEN*

3 TON

4 TON

5 TON

5

780

790

850

4

842

856

924

3

904

922

998

2

966

988

1072

1

1028

1054

1246

0

1090

1120

1220

*Pulley can be adjusted in half-turn increments.

OPTIONAL BELT-DRIVE BLOWER

All units with belt-drive blowers have single speed motors. The

 

 

 

 

CAUTION

 

 

variable pitch pulley on the blower motor can be adjusted to

Procedure foradjustingblttension:

 

 

obtain the desired supply air CFM. Refer to Table 9 for blower

1Loosennut(D)fromthemotormount.

 

should be

mot and drive data. The tension on the belts

2Never

 

nuts(C)fromeachotherwhilelooseningnut(D).

 

4Donotloosen

 

thefournuts(topandbottom)(A);unlessadditional

adjust

as shown in Figu 14.

frcetoonebetensioningatthe

5U.Adjusttancebelttensioncheckertoapplya

3

di

thetsionbyturningbolt(B).

 

 

 

isrequired;immediatelyre-tight theseboltsifloosened.

 

thedeflection

fromnormalposition,perpendicularuse

straightedgefrom

 

midpointofthespanasshown.Thedeflctionforceshouldbeappiedl

 

until

specificdeflectiondistanceof4mm(5/32")isobtained.Todetermine

 

sheavetosheavedistanceas referenceline.Therecommendeddeflectionforce

 

isasfollows:

 

ENGTH

 

 

 

 

 

 

DEFL

 

 

 

 

 

 

SPAN

 

 

 

 

 

 

FORCE

 

 

deflectionsTnsion.Checknewbeltstheatbeltthetemaxnsionshould.(Ade)atfectias2Neverontb4Donotloosenefrotwtic(C)*eenmeserecdo*uringmmendNEVER(D)theand(B)LOOSENfirstfor24thehoursbeltof operati6.Aftertoloosenadjusting,.forceAnynutsrevalues-(C)tenionre-.tighten.ingnut(D)againstfall themotortheminmount. takingmax.carenot

FIG. 14 - BELT ADJUSTMENT

Start the supply air blower motor. Adjust the resistances in both the supply and the return air duct systems to balance the air distribution throughout the conditioned space. The job specifications may require that this balancing be done by someone other than the equipment installer.

To check the supply air CFM after the initial balancing has been completed:

1.Remove the (two) ￿￿￿thefournuts(topandbottom)(A);unlessadditional " dot plugs from the holes located on the filter access panel side of the unit.

2.Insert at least 8" of 1/4 inch tubing into each of these holes for sufficient penetration into the air flow on both sides of

the evaporator coil.

Unitary Products Group

15

Page 15
Image 15
York D3EG 036 frcetoonebetensioningatthe, 2Never, thedeflection, straightedgefrom, until, isasfollows, 4Donotloosen, Defl