Zanussi ZGS 682 ICT manual Building In, Building over a cupboard or drawer

Models: ZGS 682 I ZGS 682 IC ZGS 682 ICT

1 36
Download 36 pages 40.04 Kb
Page 21
Image 21
Building In

Building In

Building over a cupboard or drawer

If the hob is to be installed above a cupboard or drawer it will be necessary to fit a heat resistant board below the base of the hob on the underside of the work surface.

It is also recommended to carry out the electrical connection to the hob as shown in diagrams 1 and 2.

Building over a kitchen unit with door

Proper arrangements must be taken in designing the furniture unit, in order to avoid any contact with the bottom of the hob which can be heated when it is operated. The recommended solution is shown in diagram 3.

The panel fitted under the hob ("a") should be easily removable to allow easy access if technical assistance is needed. The space behind the kitchen unit ("b") can be used for connections.

Dimensions are given in mm.

2

1

3

21

Page 21
Image 21
Zanussi ZGS 682 ICT manual Building In, Building over a cupboard or drawer, Building over a kitchen unit with door