Zanussi ZHC 95 ALU manual Installation of the chimney A, Fitting the hood canopy C to the wall

Models: ZHC 95 ALU

1 20
Download 20 pages 24.44 Kb
Page 15
Image 15
Fitting the hood canopy C to the wall

INSTALLATION INSTRUCTIONS

Fitting the hood canopy C to the wall

a)Remove the lower grill and the active charcoal filter if present (see paragraph on maintenance).

b)Fit the support rod B using the two screws K (3,5x9,5)provided.

c)Hook the hood canopy C to the eye bolts O fixed in holes 1.

d)Adjust the support rod B so that it pushes against the wall.

e)Adjusting position.There are two adjustable hooks at the rear of the hood, which can be used to adjust its position as follows:

-Turn the screws L until the position of screws N coincides with the lower

access holes.

-Turn the screws N to adjust

the vertical and horizontal

O

position of the hood.

O

- Lock the screws L to fasten

 

the hood against the wall.

 

-Insert the plugs T provided in the holes giving access to screws N.

B

K

A08_08

S36_09

O

Installation of the chimney A

No matter which type of installation is being used, any wooden shelves in the area where the hood is to be fitted must first be removed, drilled and later replaced.

N

 

 

L

S36_10

 

 

 

 

 

 

 

 

B

T

 

 

 

 

 

N

L

 

L

 

 

 

 

A08_11

T

 

 

 

 

 

 

 

N

15

Page 15
Image 15
Zanussi ZHC 95 ALU manual Installation of the chimney A, Fitting the hood canopy C to the wall, Installation Instructions