Zanussi ZHC 95 ALU manual Ducting or re-circulationfitting, order, Ducting fitting

Models: ZHC 95 ALU

1 20
Download 20 pages 24.44 Kb
Page 18
Image 18
Ducting or re-circulation fitting

INSTALLATION INSTRUCTIONS

Ducting or re-circulation fitting

Ducting fitting.

This is possible for all forms of installation:

a) Connect the air outlet to the external ducting system.

b) Remove the activated charcoal filter (if there is one)inside the hood canopy

(see Maintenance).

G

Re-circulation fitting

 

This is only possible with the air outlet directed upwards. Fit the venting grille G

 

onto the air outlet.The activated charcoal filter should be fitted inside the hood

 

canopy after connection to the power supply.

 

Connection to power supply and checking of good working

 

order

 

1- It is absolutely necessary to follow the warnings 3.2,3.3 and 3.4 of paragraph 3, concerning safety measures.

2

-

Loosen the two locking screws and remove the metal cover.

 

 

 

Connect the hood connection to the engine connection (a).Correctly place the

S07_23

 

 

connectors under the cover and tighten the two locking screws (b).

3

-

Once electrical connection has been carried out, check that lights, engine and

 

 

 

change of speed work.

 

4

-

Fit the lower grill and the activated carbon filter (only for filter mode)(see Maintenance).

a

S36_26

b

S36_27

18

Page 18
Image 18
Zanussi ZHC 95 ALU manual Ducting or re-circulationfitting, order, Ducting fitting, Re-circulationfitting