Zenoah BT250 Set up, SE1 SE2 SE3, English, INSTALLING HANDLE SE1, INSTALLING DEBRIS GUARD SE2

Models: BT250

1 52
Download 52 pages 29.73 Kb
Page 18
Image 18
SE1

SE1

SE2

SE3

English

6. Set up

INSTALLING HANDLE (SE1)

Mount the handle to the shaft tube and clamp it at your best operating position.

INSTALLING DEBRIS GUARD (SE2)

This model pack with already installing debris guard.

Put the debris guard on the shaft tube near the gear box, attach it with the screw, washer and nut provided.

INSTALLING CUTTING HEAD (SE3)

1.While locking the gear shaft by inserting the attached bar into the upper holder and the housing.

2.Rotate the cutting head to engage threads. Hand- tighten it securely.

18

Page 18
Image 18
Zenoah BT250 Set up, SE1 SE2 SE3, English, INSTALLING HANDLE SE1, INSTALLING DEBRIS GUARD SE2, INSTALLING CUTTING HEAD SE3