Zephyr AK7842ASX, AK7848ASX, AK7836ASX manual Installation - Mounting the Range Hood, 12 3/8”

Models: AK7836ASX AK7848ASX AK7842ASX

1 19
Download 19 pages 51.82 Kb
Page 12
Image 12
Installation – Mounting the Range Hood

Installation – Mounting the Range Hood

 

 

 

www.zephyronline.com

! CAUTION: At least two installers are

 

C/L

 

required due to the weight and size of the

 

 

hood.

 

 

 

1.

Measure distance from range top to hood bottom (30” min) Level

B

 

 

 

and mark line A.

wood board

4”

 

 

2.

Plum and mark center line.

 

 

12 3/8

3.

Mark mounting height line B. (12 3/8” from line A)

 

 

 

 

 

 

(This is the top of the board used to hang the hood)

A

 

 

4.

Mark center line of wood board and align top of board with line B.

 

 

 

Secure wood board to studs using (4) M4 wood screws. Wood Board

 

 

 

 

Dimensions: (W x D x H)

 

 

min

 

AK7836ASX - 34” x 3/4” x 4”

 

 

 

 

 

30”

 

AK7842ASX - 40” x 3/4” x 4”

 

 

 

 

 

 

 

AK7848ASX - 46” x 3/4” x 4”

 

 

 

5.

Hang hood on wood board and secure using (4) M4 x 16 screws.

 

 

 

 

NOTE: Due to the weight of this hood, ensure that the wood strip

 

 

 

 

is attached to every available stud, not into the drywall alone.

 

 

 

6.

Install blower(s). Turn to page 11 for blower installation

 

 

 

 

instructions.

 

 

 

7.

Install electrical.

 

C/L

 

8.

Install duct work and duct tape.

 

 

 

 

 

9.

Power up hood and check for leaks around duct tape.

 

 

 

10. Install optional accessories: duct cover (fig. 2). For more detailed

 

fig. 1

 

 

instructions refer to manual included with each accessory.

 

 

 

 

 

 

11. Reinstall baffle filters.

fig. 2

10

Page 12
Image 12
Zephyr AK7842ASX, AK7848ASX, AK7836ASX manual Installation - Mounting the Range Hood, 12 3/8”