Prestige 304 Broadband Sharing Gateway with 4-Port Switch

Chapter 2

Hardware Installation

This chapter shows you how to connect hardware and perform the initial setup.

2.1Prestige Front and Rear Panels

2.1.1 Front Panel LEDs

The LEDs on the front panel indicate the operational status of the Prestige.

Figure 2-1 Front Panel

The following table describes Prestige LED functions.

Table 2-1 LED Descriptions

LED

COLOR

STATUS

DESCRIPTION

SYS

Green

On

The Prestige is on and receiving power.

 

 

 

 

 

 

Off

The Prestige is not receiving power.

 

 

 

 

 

 

Flashing

The Prestige is performing a self-test.

 

 

 

 

WAN

Green

On

The WAN link is connected.

 

 

 

 

 

 

Off

The WAN link is not ready, or has failed.

 

 

 

 

 

 

Flashing

The 10M WAN link is sending/receiving packets.

 

 

 

 

LAN 1-4

Green

On

The Prestige is connected to a 10M LAN.

 

 

 

 

 

 

Off

The 10M LAN is not connected.

 

 

 

 

Hardware Installation

2-1