Porter-Cable H1000IS-W instruction manual Assemble Skyhook, Tools needed

Page 12

ASSEMBLE SKYHOOK

Tools needed:

1 - 1/2" socket or open end wrench

1 - 3/8" socket

1 - Torque wrench

Parts bag contains:

1 - Skyhook

2 - Upper brackets

5 - Screws, 5/16-18 x 7/8"

5 - Lockwashers

5 - Nuts, Whizlock 5/16"

1.Close fuel shut-off valve on tank by turning clockwise until it stops.

2.Remove four screws, and washers securing fuel tank to frame. Save screws and washers for reassembly.

3.Carefully place fuel tank inside frame rails as shown.

4.Place skyhook under frame as shown.

A01296

12- ENG

Image 12
Contents Generator Safety Guidelines / Definitions Consumer Safety InformationImportant Safety Instructions Risk of Electrocution and FireWhen installing a Double Risk of Electrocution and FireBe used OperationRisk of Fire Unit Indoors or in ANYConfined Area Risk of Breathing Inhalation Hazard Risk of Unsafe Operation Risk of HOT Surfaces Risk of Moving PartsRisk from Lifting Consumer General and Service Information SpecificationsAssembly Read and understand all safety warningsUnpacking Assemble Wheel KITWithout the hole Hole in AxleExtended Hub ENG Assemble Skyhook ENG Grounding the Generator Double Throw Transfer Switch Extension Cord Wire Gauge Chart Amperage Length SizeObtaining Electricity from the Generator Extension CordsOperation Idle Control 12V DC OutletBefore Start UP Choose the correct applicationConnecting Electrical Loads To Start the EngineStopping Engine Engine speed has been factory set to provide safe operationConnecting Procedure for Raising or Suspending Generator Maintenance Battery StorageEngine Preparation GeneratorWattage Calculations Determining Wattage RequirementsRunning Watts Starting Watts Starting Wattage Requirements 250 5001000 Household Wattage Calculator Appliance or Load Device Typical Device Wattage TotalTroubleshooting Guide StartLimited Warranty Responsibility of Original Purchaser initial UserENG Quick Facts