Porter-Cable
H1000IS-W
instruction manual
Eng
Troubleshooting
Specification
Install
Connecting Electrical Loads
Warranty
Maintenance
Battery
Safety
Double Throw Transfer Switch
Page 27
NOTES
27- ENG
A01296
Page 26
Page 28
Image 27
Page 26
Page 28
Contents
Generator
Risk of Electrocution and Fire
Safety Guidelines / Definitions
Consumer Safety Information
Important Safety Instructions
Operation
When installing a Double
Risk of Electrocution and Fire
Be used
Risk of Fire
Unit Indoors or in ANY
Confined Area
Risk of Breathing Inhalation Hazard
Risk of Unsafe Operation
Risk of HOT Surfaces
Risk of Moving Parts
Risk from Lifting
Read and understand all safety warnings
Consumer General and Service Information
Specifications
Assembly
Assemble Wheel KIT
Unpacking
Without the hole
Hole in Axle
Extended Hub
ENG
Assemble Skyhook
ENG
Grounding the Generator
Extension Cords
Double Throw Transfer Switch
Extension Cord Wire Gauge Chart Amperage Length Size
Obtaining Electricity from the Generator
Operation
Choose the correct application
Idle Control
12V DC Outlet
Before Start UP
Engine speed has been factory set to provide safe operation
Connecting Electrical Loads
To Start the Engine
Stopping Engine
Connecting Procedure for Raising or Suspending Generator
Maintenance
Generator
Battery
Storage
Engine Preparation
Wattage Calculations
Determining Wattage Requirements
Running Watts Starting Watts
Starting Wattage Requirements
250 500
1000
Appliance or Load Device Typical Device Wattage Total
Household Wattage Calculator
Start
Troubleshooting Guide
Responsibility of Original Purchaser initial User
Limited Warranty
ENG
Quick Facts
Related pages
What are the maintenance guidelines provided in the
Hobart N50 manual
?
Top
Page
Image
Contents