Rubbermaid 5L10 instruction manual Finishing Installation

Page 11

d. Install Left Door (L) and Right Door (K) into hinge openings of Front Floor (A) and hinge sockets in Front Roof (J).

Note: Only raise front edge of roof enough to install the door hinge pins.

JJ

L

K

L

K

AA

e. From inside the shed, install four Screws (AA) into the roof, two on each side wall.

Note: The screws also have to go through the Roof Brace (RB) at each end to properly secure the roof!

A second person on the outside of the shed should hold down the edge of the roof firmly at each screw location.

AA (4)

RB

J

5.0 Finishing Installation

a.

 

Install Screws (AA) into 6 locations shown at bottom of wall panels to secure walls to floor.

AA (6)

 

HELPFUL HINT: Pilot holes may be drilled for the screws.

CAUTION: Do not overtighten screws.