Rubbermaid 5L10 instruction manual Wall Panel G Installation

Page 5

3.0Wall Panel G Installation

a.Using a screwdriver, punch out the screw holes on the top of Front Left Side (G) 2 places.

Screw Holes

G

G

A

Drill a pilot hole (using 1/8" drill bit) in front lower corner

c.

Snap Front Left Side (G) into Front Floor (A).

b. at location indicated by screw target.

Hold Front Left Side (G) upright to prevent it from

Note: This pilot hole is to be drilled through both walls.

 

falling (until Left Back (D) is installed).

G

G

click ALIGN

ALIGN

A

Image 5
Contents 5L10 5L10 Care & USE Site PreparationFloor Installation Wall Panel G Installation Wall Panel D Installation Wall Panel H Installation a Wall Panel F Installation Roof Panel J & Door Installation Page Finishing Installation Click Door Finishing Installation