Rubbermaid 5L10 instruction manual Floor Installation

Page 4

2.0Floor Installation

a.Using a utility knife, cut the long side of each wall slot tab and then use a rubber mallet and screwdriver to knock it out 8 places on Front Floor (A).

1.

2.

A

b. Using a rubber mallet and screwdriver, knock out the tabs for the door hinge, 2 places on Front Floor (A).

A

c. Drill pilot hole through top surface of floor, 2 places on Front Floor (A).

CAUTION: Drill through top surface of floor only!

A

Image 4
Contents 5L10 5L10 Site Preparation Care & USEFloor Installation Wall Panel G Installation Wall Panel D Installation Wall Panel H Installation a Wall Panel F Installation Roof Panel J & Door Installation Page Finishing Installation Door Finishing Installation Click