CAUTIONS

CAUTION: Always use gloves when using a utility knife.

CAUTION: Always use eye protection/safety glasses during assembly.

CAUTION: When installing screws, do not overtighten.

CAUTION: Drill only through initial panel wall, unless otherwise indicated.

CARE & USE

Shed can be cleaned with water and mild detergent as necessary. DO NOT USE ABRASIVE DETERGENTS,

MATERIALS OR CLEANING TOOLS.

To maximize your sheds performance, remove excessive snow and/or leaf accumulation from the roof.

In the event of severe weather, please disassemble and store in a secure location.

1.0 Site Preparation

FLOOR PLAN:

Size the construction site to fit the entire floor.

OPTIONAL STEP:

If desired, recessed anchor locations (5 places)

can be used to anchor the shed floor to a foundation after you have constructed one.

3-5/8" 24 " 24 " 3-5/8 " ~4-1/2 "

18 "

~27-1/2 "

27½"

 

~5 "

~55-1/4 "

 

55¼"

120.0

24-7/8 "

Maximum opening

Build a solid, level surface for the shed foundation. Consult your local building authority for ordinances, restrictions, or permits

required before building any structure at your home.ANCHOR

Note: Minimum dimensions for foundations shown.