Rubbermaid 5L10 instruction manual

Page 2

RB

G

L

T X

 

Description

Part Number

Assembly Letter

Quantity

 

 

 

 

 

Floor

Front Floor

5L01

A

1

 

 

 

 

 

 

 

 

 

 

 

 

Left Back

5L04

D

1

Walls

Right Back

5L05

F

1

Front Left Side

5L02

G

1

 

 

Front Right Side

5L03

H

1

 

Wall Connector

5H75

Q

5

 

 

 

 

 

 

 

 

 

 

 

Left Door

5L06 / 5L41

L

1

Doors

Right Door

5L07 / 5L42

K

1

Door Handle

5L74

T

1

 

 

Lock Hasp

5F58

X

1

 

 

 

 

 

 

 

 

 

 

Roof

Front Roof

5L08

J

1

Roof Brace

5L36

RB

1

 

 

 

 

 

 

 

 

 

 

 

Hardware

#14 x 3/4" Combo Pan Head Screw

AA

24*

 

 

Accessory Bracket

5H88

 

4

 

 

 

 

 

 

* Extra screws are supplied

 

 

 

PREASSEMBLY:

J

DF

H

K

A

Required Tools

Safety

Glasses

Phillips Bit

Drill

 

 

Gloves

1/8" Drill Bit

 

 

 

 

 

Liquid

 

 

Soap

Utility Knife

Rubber Mallet

(2) Step Stools/

Stepladders

Phillips Screwdriver

Two Person Assembly

NOTE:

Qx5

5L10

76 ¾"

55 ¼"

27 ½"

 

Review ALL assembly steps before beginning construction.

Review the parts list and make sure that no parts are missing.

To simplify assembly and to ensure proper engagement of all components, apply a mild detergent to dovetail and snap fits before assembling.

Image 2
Contents 5L10 5L10 Site Preparation Care & USEFloor Installation Wall Panel G Installation Wall Panel D Installation Wall Panel H Installation a Wall Panel F Installation Roof Panel J & Door Installation Page Finishing Installation Door Finishing Installation Click