Bosch | Supplier Logistics Manual, Release. 3.0 |
- Malaysia
Plastic Spool for PgW (Power Tools division)
Unless otherwise agreed the SUPPLIER shall receive returnable packaging only to cover a defined inventory level (generally 3 days) of the product without any charge for their use (basic: future demand; Transit stock).
Standard load carriers which are used for SUPPLIER internal usage have to be procured by the supplier.
Special provisions may be made in individual cases.
Euro pallets and Euro box pallets are subject to the regulations of the European Pallet Association (Internet:
b) Special load carriers
b1)
see a).
Special load carriers for the supplier intern production process have to be procured by the supplier (supplier can use in that case Bosch purchasing conditions if agreed).
b2) SUPPLIER-specific load carriers
SUPPLIER specific load carriers must be procured by the supplier. The procurement costs for the specific load carriers is carried by Bosch if not included in the unit price.
The amount of the necessary inventory in circulation (see a), purchasing price has to be agreed with Bosch.
c). Non returnable packaging
Generally costs for non returnable packaging and there procurement have to be covered by the supplier.
2.2.2 Management of Returnable Balances
SUPPLIER shall keep accounts for returnable packaging and
BOSCH shall keep accounts for returnable packaging for at least
Robert Bosch GmbH, CP/LOG, 07.05.2007 | Page 18(35) |