DeVillbiss Air Power Company D21684 warranty Operating Procedures, Start-Up, Illustration C

Page 9

5.

 

Some pumps are shipped from the

 

 

 

factory with a red shipping plug. Refer

 

 

 

to page 16 and 17 to identify your pump.

 

 

 

The Annovi Reverberi pump can also be

 

 

 

identified by its name printed on top of

 

 

 

 

 

the pump. The shipping plug prevents any oil from

 

 

leaking out of the pump in shipping. Attached to the

 

 

shipping plug is a plastic bag which contains the

 

 

new oil plug. The shipping plug must be removed

 

 

and the new oil plug installed before the pressure

 

 

washer is operated-see illustration C. To remove

 

 

Illustration C

 

the shipping plug, turn counterclockwise and dis-

 

 

 

card. Remove the new oil plug from the plastic bag

 

 

and insert into the pump. Tighten securely.

 

OPERATING PROCEDURES

ATTENTION: Become familiar with the operating procedures before starting your unit.

Start-Up

1.Add fresh high quality unleaded gasoline—Figure 1.

2.Check engine oil level. See Engine Operator's Manual for correct amount and type.

NOTE: Some engines are equipped with a low oil sensor and the correct amount of oil must be added or the engine will not start.

3.Check pump oil level (if applicable–See Mainte- nance Section.)

4.Connect high pressure hose to pump outlet — Figure 2 for threaded hoses. Figure 3 for hose with quick connects.

Never pull water supply hose to move pressure washer. This could damage hose and/or pump inlet.

Add Gas

Figure 1

Twist Connect

Figure 2

OR

Quick Connect

OPERATION

Figure 3

9 — ENG

Image 9
Contents Pressure Washer Service Policy Index Frequently Asked Questions Important Safety Instructions Safety Cleaning Units GPM x PSI Manual for Safety, Operation, and Maintenance InstructionsOwners Responsibilities GlossaryAssembly BOX ContentsIllustration a Illustration B Multi-Reg Hi-Low/Quick Connect Dual LanceOperating Procedures Start-UpIllustration C Connect Water Turn on Water Operating Procedures contdMulti-Reg High Pressure Setting Hi-Low Dual Lance Operating Procedures contd High Pressure OperationQuick Connect with Nozzles Quick Connect Coupler Operating Procedures contd Low Pressure Operation Multi-Reg Low Pressure SettingIllustration a Annovi Reverberi Operating Procedures contd Pressure adjustmentShut Down Procedure Operating Procedures contd Chemical Flow AdjustmentThermal Relief Valve Turn off WaterHours MaintenanceFollowing pump 2200 psi Following pump 2400 psi Maintenance contdWas shipped from the factory With 10W30 synthetic oilDual Lance Soap Nozzle Maintenance contd Nozzle cleaningMaintenance contd Water Inlet Screen Cleaning Preparation for Storage Storage & Winter StorageProblem Cause Correction Troubleshooting GuideIdle down assembly if AssemblyEngine will not idle down If equipped with Idle downLimited Warranty General Manual for