AquaPRO APB200UPRO, APB250UPRO, APB150PRO Mantenimiento, Troubleshooting Guide, Continuación

Page 7

Manual del usuario

APB075PRO, APB100PRO, APB150PRO, APB200PRO, APB300PRO, APB100UPRO, APB150UPRO, APB200UPRO and APB250UPRO

Mantenimiento

8. Quite los tornillos del centro del

 

tiempo el cojinete del motor puede estar

 

comprometido, si hay excesiva corrosión

 

impulsor. Las roscas son inversas. Gire

 

(Continuación)

 

 

o se puede detectar juego en el extremo

 

hacia la derecha para aflojar el tornillo

 

 

 

 

 

 

 

 

 

del eje, el motor deberá ser reemplazado.

 

manual del filtro para ver el método.

 

(vea Figura 5).

 

 

 

REENSAMBLAJE

• ¡NUNCA apriete ni afloje la

 

 

 

 

 

 

 

 

 

 

 

abrazadera mientras la bomba está

 

 

 

 

 

 

 

Tornillo del

 

1. Obtenga un nuevo asiento y ensamble

 

funcionando!

 

 

 

 

 

 

impulsor - Para

 

 

giratorio de sello mecánico (números de

 

 

 

 

 

 

 

aflojarlo, gire

 

 

 

 

 

 

Para evitar el riesgo

 

 

 

 

 

 

 

 

referencia 8a y 8b en la página 23). Las

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

hacia la derecha

 

 

 

 

 

 

de choques eléctricos

 

 

 

 

 

 

 

 

piezas de sellado se deben remplazar

 

 

 

 

 

 

 

 

 

(Nº 4 en la pág. 23)

 

 

 

 

 

 

 

 

 

 

 

 

peligrosos o mortales, APAGUE y bloquee

 

 

 

 

 

 

 

como juego. No mezcle piezas viejas

 

 

 

 

 

 

 

 

 

 

 

la corriente que va hacia el motor antes de

 

 

 

 

 

 

 

 

 

 

 

con nuevas. Lubrique el anillo en O

trabajar en la bomba o en el motor.

 

 

 

 

 

 

 

 

 

 

 

del sello estacionario del eje con una

REPARACIÓN

 

 

 

 

 

 

 

 

 

 

 

pequeña cantidad de jabón para vajilla.

DESENSAMBLAJE

 

 

 

 

 

 

 

 

 

 

 

No permita que el jabón, suciedad,

1. Desconecte la energía desde su

Figura 5

 

grasa ni nada entre en contacto con el

 

fuente; bloquee el suministro de

9. Luego tome el impulsor y gírelo hacia la

 

lado de sellado pulido (vea Figura 8).

 

energía al motor, y coloque una

 

izquierda para quitar el impulsor del eje.

 

 

 

 

 

 

 

 

Anillo en O

 

etiqueta en el disyuntor GFCI

10. Tire del ensamble giratorio del sello

 

 

 

 

dedicado, que indique que la energía

 

 

 

estacionario

 

 

mecánico del eje del motor.

 

 

 

 

 

 

 

 

 

 

debe permanecer apagada (OFF).

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Lado de

 

 

 

 

 

 

 

 

 

 

 

 

 

 

2. Drene la bomba quitando los tapones de

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

sellado pulido,

 

drenaje en la parte inferior del cuerpo

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

mantener

 

de la bomba y del cuerpo del cesto.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

limpio

3. Desconecte las conexiones eléctricas

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

durante el

 

al motor.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

ensamblaje

4. Quite las seis perillas que sostienen la

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Figura 8

 

placa de sellado al cuerpo de la bomba.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Limpie el diámetro interno del sello, luego

5. Deslice hacia afuera de la parte trasera

 

Ensamble

 

 

 

 

 

 

 

 

presione el sello estacionario dentro del

 

de la bomba el ensamble de la placa de

 

giratorio del sello

 

 

 

 

 

 

 

 

 

diámetro interno. Cubra el lado de sellado

 

sellado/motor.

 

mecánico (8b)

 

6. Quite los tres tornillos que sostienen el

 

 

 

 

 

 

 

 

 

 

con un cartón u otro material adecuado

 

 

 

 

 

 

 

 

 

 

Figura 6

para evitar tocar el lado de sellado pulido.

 

difusor a la placa de sellado.

7. Quite la cubierta del eje del motor en

 

 

 

 

 

 

 

 

 

 

Verifique si el sello está totalmente apoyado

11. Con un destornillador haga palanca

en la parte inferior del diámetro interno.

 

la parte trasera del motor (vea Figura

 

4). Use una llave o un destornillador

 

con cuidado en el asiento estacionario

2. Vuelva a instalar el motor si lo quitó,

 

grande para detener la rotación del

 

antiguo de la placa de sellado (vea

 

 

 

lubrique el eje limpio del motor con

 

eje del motor.

 

Figura 7). NO RAYE EL DIÁMETRO

 

 

 

 

una pequeña cantidad de jabón para

 

 

 

 

 

 

 

INTERNO DEL SELLO.

 

 

 

 

 

 

 

 

 

vajilla. Deslice el nuevo ensamble del

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

sello giratorio en el eje del motor

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Sello estacionario

 

hasta que esté parejo con el soporte

 

 

 

 

 

 

 

 

 

 

 

 

mecánico (Nº 8a

 

del eje. El lado de carbono pulido

 

 

 

 

 

 

 

 

 

 

 

 

en la pág. 23)

 

debe coincidir con el lado estacionario

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

pulido. Asegúrese de que el sello esté

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

adecuadamente apoyado en la caja.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

3. Atornille el impulsor sobre el eje del

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

motor.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

4. Instale el anillo de desgaste de

 

Figura 4

 

 

 

 

 

 

 

 

 

 

 

flotación sobre el impulsor. Tenga

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

cuidado de instalar con el reborde

 

 

 

 

 

 

Figura 7

 

 

 

 

 

 

 

 

hacia afuera (vea Figura 9).

 

 

 

 

 

 

12. Si el eje está corroído o el motor está

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

sucio deberá quitarse de la placa de

 

 

 

 

 

 

 

 

 

 

 

sellado de modo que el eje se pueda

 

 

 

 

 

 

 

 

 

 

 

limpiar eficazmente.

 

 

 

 

 

 

 

 

 

 

13. Si fuera necesario use una llave de cubo

 

 

 

 

 

 

 

 

 

 

 

de 9/16 con una extensión de 6 pulg. para

 

 

 

 

 

 

 

 

 

 

 

quitar los cuatro tornillos que sostienen

 

 

 

 

 

 

 

 

 

 

 

el motor a la placa de sellado. Si el sello

 

 

 

 

 

 

 

 

 

 

 

ha estado perdiendo durante mucho

 

 

 

 

Maintenance (Cont.)

Clean bore for seal, then press seal stationary into bore. Cover seal face with cardboard or other suitable material to avoid touching polished seal face. Verify seal is fully seated in the bottom of the bore.

2.Reinstall motor if removed, lubricate clean motor shaft with a small amount of dish soap. Slide the new rotating seal assembly on to the motor shaft until it is even with the shaft sholder. Polished carbon face must mate with polished stationary face. Make certain seal is properly seated in housing.

3.Screw impeller on to motor shaft. Install left handed retaining screw and washer.

4.Install floating wear ring on impeller. Be careful to install with flange pointing out (see Figure 9).

Wear Ring

Note: flange on floating wear ring is pointing out

Figure 9

5.Replace diffuser o-ring (reference part #5 on page 11) if it is damaged. Clean o-ring groove before installing a new o-ring.

6.Install diffuser with 3 screws, coat o- ring with a small amount of dish soap to make assembly into pump body easier.

7.Replace main seal plate o-ring with a new one. Clean the surface before installing.

8.Slide rotating assembly back into pump housing.

9.Tighten six knobs in a staggered pattern so all screws are tightened evenly.

10.Pump is now ready to return to service.

Voltage can shock, burn, or cause death.

Disconnect power before working on pump or motor. Disconnect power at its

source, lock out the power, and place a tag on the dedicated GFCI circuit breaker indicating the power is to remain off.

Troubleshooting

Guide

Read and understand safety and operating instructions in this manual before doing any work on pump! Only qualified personnel should electrically test pump motor!

WATER LEAKING AROUND MOTOR:

A water leak in the area of the motor to pump connection indicates a mechanical seal failure and a shock hazard. Take pump out of service and replace seal immediately to avoid damage to other components and to reduce risk of electric shock. Refer to pump maintenance section.

FAILURE TO PUMP: REDUCED CAPACITY OR DISCHARGE PRESSURE

SUCTION LEAKS/LOST PRIME:

1.Pump must be primed; make sure that pump body and basket body are full of water. See priming instructions.

2.Make sure there are no leaks in suction piping.

3.Make sure suction inlet is well below the water level to prevent pump from sucking air.

4.Lower pump closer (vertically) to water source or install check valve in suction line.

CLOGGED PIPE/TRAP/IMPELLER, WORN IMPELLER:

5.Make sure suction trap is not clogged; if it is, clean trap and strainer. See Maintenance section.

6.Make sure impeller is not clogged (follow steps 1 through 7 under “DISASSEMBLY”, Page 6; check impeller for clogging; follow steps 7 through 10 under “REASSEMBLY”, Pages 6 - 7, for reassembly).

7.Impeller and diffuser may be worn. If so, order replacement parts from “Repair Parts List”, on pages 10 and 11.

8.Pump may be trying to push too high a column of water. If so, a “higher head” pump is needed. Call AquaPRO® Systems 1-877-278-2797.

ELECTRICAL:

9.Pump may be running too slowly; check voltage at motor terminals and at meter while pump is running. If low, see wiring instructions or consult power company. Check for loose connections.

10.Pump may be too hot.

A.Check line voltage; if less than 90% or more than 110% of rated voltage consult a licensed electrician.

B.Increase ventilation.

C.Reduce ambient temperature.

D.Tighten any loose connections.

MECHANICAL TROUBLES AND NOISE

1.If suction and discharge piping are not adequately supported, pump assembly will be strained. See “Installation”, Page 3 - 4.

2.Do not mount pump on a wooden platform! Securely mount on concrete platform for quietest performance. Use anchor holes provided in pump base.

www.aquaprosystems.com

18 Sp

7

Image 7
Contents AquaPRO Systems Manual del usuarioNº DE Modelo Nº DE Serie Fecha DE Instalación 24 SpLista de Repuestos ContentsSafety Guidelines General Safety InformationInstallation Pool Safety GuidelinesTeflon Taping Instructions Prior to Pressure TestingThreaded Connections Pump PlumbingOperation MaintenanceCaudales de la bomba para piscinas ElectricalDiagnóstico y Resolución de Problemas Mantenimiento Troubleshooting GuideContinuación ALMACENAMIENTO/ Acondicionamiento Para EL Invierno FuncionamientoCebado DE LA Bomba Drenaje DE LA BombaInstalación Continuación EléctricaRequisitos DE Succión DE LA Bomba Para Piscina Instrucciones DE Encintado DE TeflónConexiones Antes DE LA Prueba DE PresiónInstalación Replacement Parts ListInformaciones Generales deInformaciones Generales de Seguridad ÍndiceDescripción Medidas de seguridad

APB075PRO, APB100PRO, APB200UPRO, APB150UPRO, APB200PRO specifications

The AquaPRO series includes several advanced models designed for various water treatment needs, catering to both home and commercial applications. The models APB150PRO, APB300PRO, APB100UPRO, APB250UPRO, and APB200PRO share key features and cutting-edge technologies that enhance performance, efficiency, and user convenience.

The AquaPRO APB150PRO is renowned for its robust filtration system, making it an excellent choice for medium-sized households. It incorporates a multi-stage filtration process, including pre-filtration, activated carbon, and reverse osmosis, which effectively removes impurities, chlorine, and harmful contaminants. This model is equipped with a high-efficiency pump that ensures optimal water flow, delivering purified water quickly and efficiently.

The APB300PRO stands out with its higher capacity, suited for larger families or small businesses. It features an enhanced filtration technology that maximizes removal rates and provides a longer lifespan for filter cartridges. This model also includes smart features such as a digital display that monitors filter life, water quality, and operational status, providing users with real-time information and alerts.

Next in line, the AquaPRO APB100UPRO focuses on ultra-pure water production, ideal for laboratories, healthcare facilities, and sensitive industrial applications. This model integrates advanced ultraviolet (UV) sterilization technology, which eliminates bacteria and viruses, ensuring the highest level of water purity. The APB100UPRO also features an automated flushing mechanism that maintains the integrity of the membrane, enhancing its longevity and efficiency.

The APB250UPRO is designed for versatile applications, offering both ultra-pure and regular filtration options. It can easily switch between different filtration modes, making it perfect for users who require both types of water. This flexibility, combined with energy-efficient operation and low maintenance requirements, makes the APB250UPRO a popular choice among users with varying water needs.

Finally, the AquaPRO APB200PRO serves as a balanced option for users looking for performance and value. It incorporates a dual filtration process, combining activated carbon and fine particulate filters, ensuring effective removal of chlorine, sediments, and unpleasant odors. The compact design allows for easy installation and maintenance, making it suitable for both residential and small commercial settings.

In summary, the AquaPRO APB150PRO, APB300PRO, APB100UPRO, APB250UPRO, and APB200PRO models collectively represent a comprehensive range of water treatment solutions with unique features and technologies tailored to meet diverse consumer needs. Whether for home, office, or specialized applications, AquaPRO remains a dependable choice in water purification technology.