Powermate P1204 owner manual Maintenance

Page 22

MAINTENANCE

To ensure reliable generator operation, it is critical to periodically inspect all components. The following chart is provided as a guide for service check intervals. When the generator is operated under excessively hot, or dusty conditions, shorten service intervals according to the severity of the conditions encountered. To perform periodic inspections or maintenance, refer to the

procedures listed in the following sections. A qualified generator service technician should perform inspections or adjustments requiring specialized tools or training. Users unfamiliar with any of the listed procedures should contact an authorized dealer for servicing assistance.

Maintenance Item

Every month

Every 6 months

Every year or

Every 2 years

or 8 hours

or 100 hours

300 hours

or 500 hours

 

 

 

 

 

 

 

 

Engine Oil

Check

X

 

 

 

 

 

 

 

 

 

 

Change

 

X1

 

 

 

 

 

 

 

 

Engine Oil Filter

Change

 

X

 

 

 

 

 

 

 

 

Oil Cooler

Check and clean

 

X

 

 

 

 

 

 

 

 

Engine Air Filter

Check

X

 

 

 

 

 

 

 

 

 

 

Change

 

 

X

 

 

 

 

 

 

 

Battery

Check and clean

 

X

 

 

 

 

 

 

 

 

Battery Charger

Check

 

X

 

 

 

 

 

 

 

 

Spark Plugs

Check

 

 

X

 

 

 

 

 

 

 

 

Replace

 

 

 

X

 

 

 

 

 

 

Valve Clearance

Check and Adjust

 

 

X

 

 

 

 

 

 

 

Generator Output

Check and Adjust

 

 

X

 

Frequency

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Fuel System

Check

 

X

 

 

 

 

 

 

 

 

Cooling Air Openings

Check

X

 

 

 

1. Perform first change at 25 hours.

22

200-2667

Image 22
Contents Stationary Standby Electric Generator Model Series P1204Table of Contents General Safety Guidelines General Safety Guidelines Introductio N Installation Plannin GUnpacking Instruction S Generator Specifications P120401 12 KWInstallation Drawings Location and Generator Generator InstallationPlacemen T Placement and Anchoring Utomatic Transfer Switch Electrical Hookup AIN Line Output Powe RGenerator Start Signal Utility Circuit SupplyWiring Diagram Fuel Hooku P Fuel SpecificationsConsumption Require Ments Fuel RequirementsNatural Gas NG Battery Placement Battery Requirement SConnectio N Nnection con t LubricationFirst Time Startup Generator Operatio NCircuit Breaker Control Panel Feature SFuses Cyclic Crank Generator Control Panel Operatio NStarting the Generator RUN StateStatus Indicators FaultsMaintenance Engine OIL Level Check Upper Limit Lower LimitEngine OIL Cooler Inspection ND Clean ING Engine OIL and OIL Filter HangeBattery Maintenanc E Engine AIR Filter ChangeTT ERY Maintenanc E con t Spark Plug Chec KValve Clearance Check Adjustmen TNclosure and Site Fuel System InspectionTroubleshooting Symptom Possible Cause Corrective ActionTroubleshooting 200-2667 Powerstation Automated Power System Limited Warranty Contact the Powermate Product Service Department AT