IBM Z10 EC manual Amendment for CBU Tests

Page 40

Capacity Back Up (CBU): Temporary access to dormant processing units (PUs), intended to replace capacity lost within the enterprise due to a disaster. CP capacity or any and all specialty engine types (zIIP, zAAP, SAP, IFL, ICF) can be added up to what the physical hardware model can contain for up to 10 days for a test activation or 90 days for a true disaster recovery.

On system z10 the CBU entitlement records contain an expiration date that is established at the time of order and is dependent upon the quantity of CBU years. You will now have the capability to extend your CBU entitle- ments through the purchase of additional CBU years. The number of CBU years per instance of CBU entitlement remains limited to fi ve and fractional years are rounded up to the near whole integer when calculating this limit. For instance, if there are two years and eight months to the expiration date at the time of order, the expiration date can be extended by no more than two additional years. One test activation is provided for each additional CBU year added to the CBU entitlement record.

CBU Tests: The allocation of the default number of test activations changed. Rather than a fi xed default number of fi ve test activations for each CBU entitlement record, the number of test activations per instance of the CBU entitlement record will coincide with the number of CBU years, the number of years assigned to the CBU record. This equates to one test activation per year for each CBU entitlement purchased.

These changes apply only to System z10 and to CBU entitlements purchased through the IBM sales channel or directly from Resource Link.

There are now terms governing System z Capacity Back Up (CBU) which allow customers to execute production workload on a CBU Upgrade during a CBU Test..

While all new CBU contract documents contain the new CBU Test terms, existing CBU customers will need to exe- cute a contract to expand their authorization for CBU Test upgrades if they want to have the right to execute produc- tion workload on the CBU Upgrade during a CBU Test.

Amendment for CBU Tests

The modifi cation of CBU Test terms is available for existing CBU customers via the IBM Customer Agreement Amend- ment for IBM System z Capacity Backup Upgrade Tests (in the US this is form number Z125-8145). This amendment can be executed at any time, and separate from any par- ticular order.

Capacity for Planned Event (CPE): Temporary access to dormant PUs, intended to replace capacity lost within the enterprise due to a planned event such as a facility upgrade or system relocation. This offering is available only on the System z10. CPE is similar to CBU in that it is intended to replace lost capacity; however, it differs in its scope and intent. Where CBU addresses disaster recovery scenarios that can take up to three months to remedy, CPE is intended for short-duration events lasting up to three days, maximum. Each CPE record, once activated, gives you access to all dormant PUs on the machine that can be confi gured in any combination of CP capacity or specialty engine types (zIIP, zAAP, SAP, IFL, ICF).

On/Off Capacity on Demand (On/Off CoD): Temporary access to dormant PUs, intended to augment the existing capacity of a given system. On/Off CoD helps you contain workload spikes that may exceed permanent capacity such that Service Level Agreements cannot be met and business conditions do not justify a permanent upgrade. An On/Off CoD record allows you to temporarily add CP capacity or any and all specialty engine types (zIIP, zAAP, SAP, IFL, ICF) up to the following limits:

The quantity of temporary CP capacity ordered is limited by the quantity of purchased CP capacity (permanently active plus unassigned).

40

Image 40
Contents IBM System z10 Enterprise Class z10 EC Reference Guide Table of Contents IBM System z10 Enterprise Class z10 EC Overview Just-in-time deployment of IT resources Specialty engines offer an attractive alternativeOrder of introduction Numerical computing on the chipArchitecture Liberating your assets with System zEvolving for your business Z10 EC ArchitecturePage Commitment to system integrity Page TPF VSELinux on System z Z10 EC Operating System ESA/390Page Page Z10 EC Design and Technology Z10 EC Model Z10 EC model upgrades Z10 EC Base and Sub-capacity OfferingsLarge System Performance Reference Z10 EC PerformanceCPU Measurement Facility Z10 EC I/O Subsystem System I/O Configuration AnalyzerZ10 EC Channels and I/O Connectivity Concurrent Update Ficon Express4 and Ficon Express2 PerformanceSupport of Spanned Channels and Logical Partitions Modes of OperationFCP Channels Ficon Support for Cascaded DirectorsFCP increased performance for small block sizes Scsi IPL now a base function FCP Full fabric connectivityFicon and FCP for connectivity to disk, tape, and printers Platform and name server registration in Ficon channelIt will register NPort ID Virtualization Program Directed re-IPLOSA-Express3 Ethernet features Summary of benefits Feature Infrastructure Ports perPort density or granularity Features OSA-Express2 availabilityPurpose/Traffic TypeOSA-Express3 10 Gigabit Ethernet SR OSA-Express3 Gigabit Ethernet LXOSA-Express3 Gigabit Ethernet SX Four-port exploitation on OSA-Express3 GbE SX and LXNetwork Traffic Analyzer Dynamic LAN idle for z/OSLink aggregation for z/VM in Layer 2 mode Layer 2 transport mode When would it be used?Direct Memory Access DMA OSA Layer 3 Virtual MAC for z/OSHardware data router IBM Communication Controller for Linux CCLRemove L2/L3 LPAR-to-LPAR Restriction OSA Integrated Console ControllerOSA/SF Virtual MAC and Vlan id Display Capability HiperSockets HiperSockets Enhancement for zIIP Exploitation Can Do IT securely Security CryptographyCP Assist for Cryptographic Function Cpacf Configurable Crypto Express2 Dynamically add crypto to a logical partition Secure Key AESTKE 5.3 workstation and support for Smart Card Reader Enhancement with TKE 5.3 LICTKE additional smart cards System z10 EC cryptographic migrationRemote Key Loading Benefits Remote Loading of Initial ATM KeysImproved Key Exchange With Non-CCA Cryptographic Systems On Demand Capabilities Capacity on Demand Temporary CapacityAmendment for CBU Tests Capacity Provisioning OS Capacity provisioning allows you to set up rules System z9 System z10Reliability, Availability, and Serviceability RAS RAS Design FocusHardware System Area HSA Availability FunctionsEnhanced Book Availability Concurrent Physical Memory Upgrade Concurrent Physical Memory ReplacementConcurrent Defective Book Replacement Enhanced Driver MaintenanceTransparent Sparing Plan Ahead MemoryService Enhancements Power MonitoringPower Estimation Tool Environmental EnhancementsParallel Sysplex Cluster Technology IBM Systems Director Active Energy ManagerImproved service time with Coupling Facility Duplex Coupling Facility Control Code Cfcc LevelSystem-Managed CF Structure Duplexing Coupling Facility Configuration AlternativesParallel Sysplex Coupling Connectivity Introducing long reach InfiniBand coupling links Coupling Connectivity for Parallel SysplexZ10 Coupling Link Options Z10 EC MaxServer Time Protocol STP Time synchronization and time accuracy on z10 ECPreview Improved STP System Management with Enhanced Network Time Protocol NTP client support Continuous availability of NTP servers used as ExterNTP server on Hardware Management Console HMC Enhanced STP recovery when Internal Battery FeatureApplication Programming Interface API to automate Internal Battery Feature Recommendation HMC System Support Family Machine TypeInternet Protocol, Version 6 IPv6 HMC/SE Console MessengerHMC z/VM Tower systems management enhancements Implementation Services for Parallel Sysplex GdpsFiber Quick Connect for Ficon LX Environments Z10 EC Physical Characteristics Z10 EC Configuration Detail Z10 EC Dimensions Z9 EC Number of Frames 2 FrameZ10 EC Environmentals Model O Cage Model O CageProcessor Unit Features Model OSA-Express3 and OSA-Express2 Features Min MaxCPs IFLs ICFsGeneral Information Coupling Facility CF Level of Support Z9 BCStatement of Direction Following Redbook publications are available now PublicationsResource Link ZSO03018-USEN-02