IBM Z10 EC manual OS Capacity provisioning allows you to set up rules, System z9 System z10

Page 42

z/OS Capacity provisioning allows you to set up rules

defi ning the circumstances under which additional capac- ity should be provisioned in order to fulfi ll a specifi c busi- ness need. The rules are based on criteria, such as: a specifi c application, the maximum additional capacity that should be activated, time and workload conditions. This support provides a fast response to capacity changes and ensures suffi cient processing power will be available with the least possible delay even if workloads fl uctuate.

An installed On/Off CoD record is a necessary prerequisite for automated control of temporary capacity through z/OS Capacity Provisioning.

See z/OS MVS Capacity Provisioning User’s Guide (SA33-8299) for more information.

On/Off CoD Test: On/Off CoD allows for a no-charge test. No IBM charges are assessed for the test, including IBM charges associated with temporary hardware capacity, IBM software, or IBM maintenance. This test can be used to validate the processes to download, stage, install, acti- vate, and deactivate On/Off CoD capacity non-disruptively. Each On/Off CoD-enabled server is entitled to only one no- charge test. This test may last up to a maximum duration of 24 hours commencing upon the activation of any capac- ity resources contained in the On/Off CoD record. Activa- tion levels of capacity may change during the 24 hour test period. The On/Off CoD test automatically terminates at the end of the 24 hours period. In addition to validating the On/Off CoD function within your environment, you may choose to use this test as a training session for your per- sonnel who are authorized to activate On/Off CoD.

SNMP API (Simple Network Management Protocol Appli- cation Programming Interface) enhancements have also been made for the new Capacity On Demand features.

More information can be found in the System z10 Capacity On Demand User’s Guide, SC28-6871.

Capacity on Demand – Permanent Capacity

Customer Initiated Upgrade (CIU) facility: When your business needs additional capacity quickly, Customer Initiated Upgrade (CIU) is designed to deliver it. CIU is designed to allow you to respond to sudden increased capacity requirements by requesting a System z10 EC PU and/or memory upgrade via the Web, using IBM Resource Link, and downloading and applying it to your System z10 EC server using your system’s Remote Support connec- tion. Further, with the Express option on CIU, an upgrade may be made available for installation as fast as within a few hours after order submission.

Permanent upgrades: Orders (MESs) of all PU types and memory for System z10 EC servers that can be delivered by Licensed Internal Code, Control Code (LIC-CC) are eligible for CIU delivery. CIU upgrades may be performed up to the maximum available processor and memory resources on the installed server, as confi gured. While capacity upgrades to the server itself are concurrent, your software may not be able to take advantage of the increased capacity without performing an Initial Program- ming Load (IPL).

 

System z9

System z10

Resources

CP, zIIP, zAAP, IFL, ICF

CP, zIIP, zAAP, IFL, ICF, SAP

 

 

 

Offerings

Requires access to IBM/

No password required

 

RETAIN® to activate

to IBM/RETAIN to activate

 

CBU, On/Off CoD

CBU, On/Off CoD, CPE

 

One offering at a time

Multiple offerings active

 

 

 

Permanent

Requires de-provisioning

Concurrent with temporary

upgrades

of temporary capacity first

offerings

 

 

 

Replenishment

No

Yes w/ CBU & On/Off CoD

CBU Tests

5 tests per record

Up to 15 tests per record

 

 

 

CBU Expiration

No expiration

Specific term length

Capacity

 

 

Provisioning

No

Yes

Manager Support

 

 

42

Image 42
Contents IBM System z10 Enterprise Class z10 EC Reference Guide Table of Contents IBM System z10 Enterprise Class z10 EC Overview Just-in-time deployment of IT resources Specialty engines offer an attractive alternativeOrder of introduction Numerical computing on the chipEvolving for your business ArchitectureLiberating your assets with System z Z10 EC ArchitecturePage Commitment to system integrity Page VSE TPFLinux on System z Z10 EC Operating System ESA/390Page Page Z10 EC Design and Technology Z10 EC Model Z10 EC model upgrades Z10 EC Base and Sub-capacity OfferingsZ10 EC Performance Large System Performance ReferenceCPU Measurement Facility Z10 EC I/O Subsystem System I/O Configuration AnalyzerZ10 EC Channels and I/O Connectivity Support of Spanned Channels and Logical Partitions Concurrent UpdateFicon Express4 and Ficon Express2 Performance Modes of OperationFicon Support for Cascaded Directors FCP ChannelsFCP increased performance for small block sizes Ficon and FCP for connectivity to disk, tape, and printers Scsi IPL now a base functionFCP Full fabric connectivity Platform and name server registration in Ficon channelIt will register NPort ID Virtualization Program Directed re-IPLFeature Infrastructure Ports per OSA-Express3 Ethernet features Summary of benefitsPort density or granularity Purpose/Traffic FeaturesOSA-Express2 availability TypeOSA-Express3 Gigabit Ethernet SX OSA-Express3 10 Gigabit Ethernet SROSA-Express3 Gigabit Ethernet LX Four-port exploitation on OSA-Express3 GbE SX and LXNetwork Traffic Analyzer Dynamic LAN idle for z/OSLink aggregation for z/VM in Layer 2 mode Layer 2 transport mode When would it be used?Hardware data router Direct Memory Access DMAOSA Layer 3 Virtual MAC for z/OS IBM Communication Controller for Linux CCLOSA Integrated Console Controller Remove L2/L3 LPAR-to-LPAR RestrictionOSA/SF Virtual MAC and Vlan id Display Capability HiperSockets HiperSockets Enhancement for zIIP Exploitation Security Cryptography Can Do IT securelyCP Assist for Cryptographic Function Cpacf Configurable Crypto Express2 Dynamically add crypto to a logical partition Secure Key AESTKE additional smart cards TKE 5.3 workstation and support for Smart Card ReaderEnhancement with TKE 5.3 LIC System z10 EC cryptographic migrationRemote Loading of Initial ATM Keys Remote Key Loading BenefitsImproved Key Exchange With Non-CCA Cryptographic Systems On Demand Capabilities Capacity on Demand Temporary CapacityAmendment for CBU Tests Capacity Provisioning OS Capacity provisioning allows you to set up rules System z9 System z10Reliability, Availability, and Serviceability RAS RAS Design FocusAvailability Functions Hardware System Area HSAEnhanced Book Availability Concurrent Defective Book Replacement Concurrent Physical Memory UpgradeConcurrent Physical Memory Replacement Enhanced Driver MaintenanceTransparent Sparing Plan Ahead MemoryPower Estimation Tool Service EnhancementsPower Monitoring Environmental EnhancementsParallel Sysplex Cluster Technology IBM Systems Director Active Energy ManagerImproved service time with Coupling Facility Duplex Coupling Facility Control Code Cfcc LevelCoupling Facility Configuration Alternatives System-Managed CF Structure DuplexingParallel Sysplex Coupling Connectivity Introducing long reach InfiniBand coupling links Coupling Connectivity for Parallel SysplexZ10 Coupling Link Options Z10 EC MaxTime synchronization and time accuracy on z10 EC Server Time Protocol STPPreview Improved STP System Management with Enhanced Network Time Protocol NTP client support Continuous availability of NTP servers used as ExterEnhanced STP recovery when Internal Battery Feature NTP server on Hardware Management Console HMCApplication Programming Interface API to automate Internal Battery Feature Recommendation Internet Protocol, Version 6 IPv6 HMC System SupportFamily Machine Type HMC/SE Console MessengerHMC z/VM Tower systems management enhancements Implementation Services for Parallel Sysplex GdpsFiber Quick Connect for Ficon LX Environments Z10 EC Environmentals Model O Cage Z10 EC Physical Characteristics Z10 EC Configuration DetailZ10 EC Dimensions Z9 EC Number of Frames 2 Frame Model O CageCPs IFLs Processor Unit Features ModelOSA-Express3 and OSA-Express2 Features Min Max ICFsGeneral Information Coupling Facility CF Level of Support Z9 BCStatement of Direction Publications Following Redbook publications are available nowResource Link ZSO03018-USEN-02