Installation and Configuration
User Signals
Figure 2.6 J21 User Signal Connector Circuit Block Diagram
J21 Cable Use a standard
To install the ferrite block:
1.Position the block no more than 5 cm (2") from the power supply end of the J21 user cable.
2.Open the ferrite block housing.
3.Loop the cable through the ferrite block. See Figure 2.7, “J21 User Cable with Ferrite Block” on page 32.
4.Close the housing clip.
The ferrite block ensures that the power supply system meets radiated emission requirement 89/336/EEC for CE mark approval. See the power supply's operating manual for noise specifications.
Release 1.2 | 31 |