IBM 9179-MHB, 9117-MMB manual System hardware is functioning correctly

Page 98

2.Do you have any field-replaceable units (FRUs) (for example cards, adapters, cables, or devices) that were removed during problem analysis that you want to put back into the system?

Note: If the system planar or battery has been replaced and you are loading diagnostics from a server over a network, it might be necessary for the customer to set the network boot information for this system before diagnostics can be loaded. The system time and date information should also be set when the repair is completed.

v Yes: Reinstall all of the FRUs that were removed during problem analysis. Go to step 3

vNo: Continue with the next step.

3.Is the system or logical partition that you are performing a repair action on running the AIX operating system?

vYes: Continue with the next step.

vNo: Go to step 5.

4.Does the system or logical partition you are performing a repair action on have AIX installed? Note: Answer no to this question if you have just replaced a hard disk in the root volume group.

vYes: Go to step 7.

vNo: Continue with the next step.

5.Run stand-alone diagnostics in problem determination mode from either a CD-ROM or from a Network Installation Management (NIM) server.

Note: For instructions on running stand-alone diagnostics from a CD and not using an HMC, go to Running the stand-alone diagnostics from CD on a server without an HMC attached.

For instructions on running stand-alone diagnostics from a NIM server, go to Running the stand-alone diagnostics from a Network Installation Management server.

Did you encounter any problems?

vYes: Go to problem analysis.

vNo: Continue with the next step.

6.The system hardware is functioning correctly.

If the system attention LED is still on, turn off the LED as described in “Activating and deactivating LEDs” on page 93.

This completes the repair.

Note: If, during the processing of the list of open service action events, some service action events remained open, further service actions might be required to complete the repair.

Return the server to the state that the customer normally uses, such as IPL type, IPL mode, and the way the system is configured or partitioned. This might require you to reboot the operating system.

Attention: Before returning the system to the customer, remove the system from service mode. If the system is left in service mode, it automatically places a call for service every two hours.

7.Complete the following steps:

86Power Systems: Power supplies for the 9117-MMB or 9179-MHB

Image 98
Contents Power supplies for the 9117-MMB or 9179-MHB Page Power supplies for the 9117-MMB or 9179-MHB Copyright IBM Corporation 2010 Contents Iv Power Systems Power supplies for the 9117-MMB or 9179-MHB Laser safety information World Trade safety informationGerman safety information Laser complianceVi Power Systems Power supplies for the 9117-MMB or 9179-MHB Safety notices Page L003 Power Systems Power supplies for the 9117-MMB or 9179-MHB Whats new in Power supplies MarchRemoving the power supply Related information Before you begin Identifying a failing part Connect the power cable a to the power supply Close the rear rack door Replacing the power supply Power supply LEDs Power supplies FRU fault and identify LED Removing a power supply Fan fault LED and fan identify button Related information Power Systems Power supplies for the 9117-MMB or 9179-MHB Removing a power supply Removing a power supply fan Power supplies Replacing a fan Connecting the power cable to the front of an expansion unit Expansion unit ac power and OCA power LEDs Related information Replacing a fan Replacing a power supply Expansion unit ac power and OCA power LEDs Related information Power Systems Power supplies for the 9117-MMB or 9179-MHB Removing an input power distribution assembly cover Related information Replacing an input power distribution assembly Connecting the power cables at the rear of an expansion unit Replacing an input power distribution assembly Replacing an input power distribution assembly cover Common procedures for installable features Before you beginPower Systems Power supplies for the 9117-MMB or 9179-MHB Power supplies Identifying a part Control panel LEDsControl panel Deactivating the failing-part indicator light Select Display Previous Diagnostic Results and press EnterActivating the indicator light for the failing part Related conceptsActivating the failing-part indicator light Related information Identifying a part by using the Virtual I/O Server Starting the system or logical partition Starting a system that is not managed by an HMC or an SdmcPower supplies Stopping a system or logical partition Stopping a system that is not managed by an HMC or an SdmcStopping a system by using the Hardware Management Console From the Actions menu, select Operations → Power Off Placing the system in the service position Placing the system into the operating position Removing and replacing covers for the 8202-E4B or 8205-E6B Removing the front cover Removing the front cover Removing the front cover Installing the front cover Removing the service access cover Installing the outside service access cover Installing the service access cover Installing the inside service access cover Installing the outside service access cover Removing the power cords for a rack-mounted system Tasks area expand Serviceability → Hardware → MES Tasks Connecting the power cordsVerifying the installed part Did the Resource Repair Action menu appear? No Go to step No. This ends the procedure Sign on with at least service level authority Verifying an installed part by using stand-alone diagnostics Choose Commit Exit to the command line Activating and deactivating LEDs by using the HMC Click Close EventSelect Actions → View Comments Viewing serviceable events by using the HMCSelect Manage Serviceable Events Deactivating a system attention LED or partition LED Activating or deactivating identify LED by using the Sdmc Select Actions → System Status and Health → Event LogPower supplies Select Commit Follow any instructions that are shown Verifying a repair Load the operating systemDid you encounter any problems? Verifying the repair in AIXPerform the following steps Did another Resource Repair Action 801015 display? Yes Power supplies Procedure Verifying the repair in Linux Verifying the repair from the management consoleClosing a service call View Serviceable Event DetailsPower supplies Yes Go to step No Continue with the next step Select the No FRU Replaced for this Serviceable Event option Power Systems Power supplies for the 9117-MMB or 9179-MHB Closing a service call using AIX or Linux System hardware is functioning correctly Select the Diagnostics Routines option Power Systems Power supplies for the 9117-MMB or 9179-MHB Power supplies Yes Continue with the next step No Go to step Click Close Event Is the error class recorded in on page 91? Activating and deactivating LEDs Open Operations Open LED Status Click Actions Service and Support Hardware Identify LED Click Save settings Copyright IBM Corp Class a Notices TrademarksElectronic emission notices Ethernet connection usage restrictionEuropean Community Compliance Statement Industry Canada Compliance StatementAvis de conformité à la réglementation dIndustrie Canada Vcci Statement JapanElectromagnetic Interference EMI Statement Taiwan IBM Taiwan Contact InformationPage Class B Notices Electromagnetic Interference EMI Statement RussiaIndustry Canada Compliance Statement Power Systems Power supplies for the 9117-MMB or 9179-MHB Terms and conditions Power Systems Power supplies for the 9117-MMB or 9179-MHB