Cisco Systems 9124E manual Interpreting Post results, Boot

Page 35

Boot

Boot completes in approximately three minutes if POST is run. Boot includes the following tasks after POST completes:

Universal port configuration

Links initialized

The fabric is analyzed, and if any ports are connected to other switches, the switch participates in a fabric configuration

The switch obtains a domain ID and assigns port addresses

Unicast routing tables constructed

Normal port operation enabled

Interpreting POST results

To determine whether POST completed successfully and whether any errors were detected:

1.Verify that the switch LEDs indicate all components are healthy. See Table 12 for description and interpretation of LED patterns.

2.Verify that the switch prompt appears on the terminal of a computer workstation connected to the switch. If there is no switch prompt when POST completes, press Enter. If the switch prompt still does not appear, try opening another telnet session or another management tool. If this is not successful, the switch did not successfully complete POST. Contact HP.

3.Review the switch system log for errors. Any errors detected during POST are written to the system log, accessible through the show logging logfile command. For information about all referenced commands and accessing the error log, and error messages, refer to the Cisco MDS 9000 Family System Messages Guide.

Cisco MDS 9124e Fabric Switch for HP c-Class BladeSystem 35

Image 35
Contents Cisco MDS 9124e Fabric Switch for HP c-Class BladeSystem Legal and notice information Contents Electrostatic discharge Managing the SwitchRegulatory compliance and safety Switch technical specificationsGlossary Contents Contacting HP Technical Support About this guideIntended audience Related documentationDocument conventions Convention Element Document conventions and symbolsOther HP web sites Subscription serviceAbout This Guide Overview Switch featuresComponent identification Internal ports summary Port side of the SwitchSwitch redundancy PortChannel Switch licensingOptional hardware Optional hardware kitsOverview Shipping carton contents SetupElectrical considerations Installation and safety considerationsInstalling the Switch Installing multiple switchesScale 2/3 = OA power verification Checking LEDs Setting the IP addressPower-on LEDs IndicatorsOA connect interconnect Resetting the IP AddressConnecting to the Command Line Interface Configuring the SwitchItems Required for Configuration Verifying Installed Licenses Setting the date and timeDisabling and enabling a port Modifying the FC domain ID optionalOn Demand Ports Backing up the configuration Recovering the Admin PasswordVerifying the configuration Switchboot# dir bootflash Set Up Management features Managing the SwitchReplacing an SFP transceiver Maintaining the SwitchInstalling dust covers in empty ports Installing an SFP SFP components Replacing the SwitchPowering on and off Interpreting LED activity LED indicatorsFront panel LED indicators during normal operation Port link status LED patterns LED color Post and boot specificationsLED patterns Interpreting Post results BootManaging the Switch Cables Regulatory compliance and safetyRegulatory compliance ModificationsCertification and classification information Laser safety warningLaser device Regulatory compliance identification numbersClass a equipment International notices and statementsCanadian notice avis Canadien European Union noticeBsmi notice Japanese notice Korean notices Taiwan battery recycling notice SafetyBattery replacement notice Dutch notice Japanese power cord statementWaste Electrical and Electronic Equipment directive English noticeFinnish notice Czechoslovakian notice Estonian noticeGerman notice French noticeGreek notice Hungarian notice Latvian notice Italian noticePortuguese notice Lithuanian notice Polish noticeSlovakian notice Slovenian notice Spanish notice Swedish notice Regulatory compliance and safety Grounding methods How to prevent electrostatic dischargeElectrostatic discharge Electrostatic discharge General specifications Specification Switch technical specificationsGeneral specifications Switch physical dimensions Dimension Weight and physical dimensionsEnvironmental requirements Condition Environmental requirementsSupported SFPs Supported HBAsSwitch technical specifications Glossary FCS switch Directory serviceEnabled zone ErrorFrame Fibre ChannelFill word FLPortLink Link servicesLPort LatencyMode SwitchNode Non-participatingRequest rate Service rateSingle mode Switch portTrap Snmp TopologyTransmission CharacterGlossary Index Index Cisco MDS 9124e Fabric Switch for HP c-Class BladeSystem Index