Cisco Systems 9124E manual Maintaining the Switch, Installing dust covers in empty ports

Page 30

The gateway address of the first switch should be set to whatever the gateway address is for the subnet on which the first switch resides. See Table 9.

Table 9 Connecting via a management station

 

Management

First switch

Second switch

Third switch

 

station

 

 

 

 

 

 

 

 

Ethernet

192.168.1.09

192.168.1.10

204.1.1.11

204.1.1.12

 

 

 

 

 

FCIP

192.168.65.09

192.168.65.10

192.168.65.11

192.168.65.12

 

 

 

 

 

Gateway

192.168.1.10

any, not self

192.168.1.10

192.168.1.10

 

 

 

 

 

Maintaining the Switch

The Cisco MDS 9124e Switch does not require any regular physical maintenance. However, it is critical that environmental conditions, described in ”Environmental considerations” are met to help prevent switch failure due to heat stress or improper air flow.

Installing dust covers in empty ports

The dust covers included in the Cisco MDS 9124e Switch shipping carton, (see Figure 1) must be inserted in ports where SFPs are not installed. Installing dust covers ensures proper airflow and helps reduce dust contamination of the switch.

Replacing an SFP transceiver

In some cases you might need to reinstall an SFP transceiver. To remove an SFP transceiver:

1.Press and hold the cable release.

2.Remove the cable from the transceiver.

3.Pull the bail (wire handle) to release the transceiver.

4.Grasp the bail, and gently but firmly pull the transceiver out of the port.

5.Repeat this procedure for the remaining ports as required.

To install a replacement SFP:

1.Make sure that the bail is in the unlocked position.

2.Orient the SFP with the appropriate port. See Figure 7 and Table 10.

30 Managing the Switch

Image 30
Contents Cisco MDS 9124e Fabric Switch for HP c-Class BladeSystem Legal and notice information Contents Switch technical specifications Managing the SwitchRegulatory compliance and safety Electrostatic dischargeGlossary Contents Related documentation About this guideIntended audience Contacting HP Technical SupportDocument conventions and symbols Document conventions Convention ElementSubscription service Other HP web sitesAbout This Guide Switch features OverviewComponent identification Port side of the Switch Switch redundancyInternal ports summary Switch licensing PortChannelOptional hardware kits Optional hardwareOverview Setup Shipping carton contentsInstalling multiple switches Installation and safety considerationsInstalling the Switch Electrical considerationsScale 2/3 = OA power verification Indicators Setting the IP addressPower-on LEDs Checking LEDsResetting the IP Address OA connect interconnectConfiguring the Switch Items Required for ConfigurationConnecting to the Command Line Interface Setting the date and time Verifying Installed LicensesModifying the FC domain ID optional On Demand PortsDisabling and enabling a port Recovering the Admin Password Verifying the configurationBacking up the configuration Switchboot# dir bootflash Set Up Managing the Switch Management featuresMaintaining the Switch Installing dust covers in empty portsReplacing an SFP transceiver Replacing the Switch Installing an SFP SFP componentsPowering on and off LED indicators Front panel LED indicators during normal operationInterpreting LED activity Post and boot specifications LED patternsPort link status LED patterns LED color Boot Interpreting Post resultsManaging the Switch Modifications Regulatory compliance and safetyRegulatory compliance CablesRegulatory compliance identification numbers Laser safety warningLaser device Certification and classification informationEuropean Union notice International notices and statementsCanadian notice avis Canadien Class a equipmentBsmi notice Japanese notice Korean notices Safety Battery replacement noticeTaiwan battery recycling notice English notice Japanese power cord statementWaste Electrical and Electronic Equipment directive Dutch noticeCzechoslovakian notice Estonian notice Finnish noticeFrench notice German noticeGreek notice Hungarian notice Italian notice Latvian noticeLithuanian notice Polish notice Portuguese noticeSlovakian notice Slovenian notice Spanish notice Swedish notice Regulatory compliance and safety How to prevent electrostatic discharge Electrostatic dischargeGrounding methods Electrostatic discharge Switch technical specifications General specificationsGeneral specifications Specification Weight and physical dimensions Switch physical dimensions DimensionSupported HBAs Environmental requirementsSupported SFPs Environmental requirements ConditionSwitch technical specifications Glossary Error Directory serviceEnabled zone FCS switchFLPort Fibre ChannelFill word FrameLatency Link servicesLPort LinkNon-participating SwitchNode ModeSwitch port Service rateSingle mode Request rateCharacter TopologyTransmission Trap SnmpGlossary Index Index Cisco MDS 9124e Fabric Switch for HP c-Class BladeSystem Index