Cisco Systems 5500 manual Checking the Installation

Page 17

Chapter 7 Maintaining the Cisco Catalyst 5500 Multiswitch Router

Replacing Hardware Components

Checking the Installation

Perform the following steps to verify that the new fan assembly is installed correctly:

Step 1 Listen for the fans; you should immediately hear them operating. If you do not hear them, ensure that the fan assembly is completely inserted in the chassis and that the faceplate is flush with the switch back panel.

Step 2 If after several attempts the fans do not operate, or if you experience trouble with the installation (for instance, if the captive installation screws do not align with the chassis holes), contact the Cisco Technical Assistance Center (TAC) for assistance. Refer to the “Obtaining Technical Assistance” section on page xviii for information on contacting the Cisco TAC.

Cisco MGC Software Release 7 Operations, Maintenance, and Troubleshooting Guide

 

OL-0542-06

7-17

 

 

 

Image 17
Contents Cisco Catalyst 5500 LEDs Maintaining the Cisco Catalyst 5500 Multiswitch RouterConsole and Auxiliary ports Supervisor Engine Module LEDsSlot Ethernet Switching Module 10BaseT 24 Port LEDsRSM WS-X5302 LEDs Route Switch Module LEDsRSM Using the Command Line Interface to Check StatusRemoving the Supervisor Engine Avoiding Problems When Inserting and Removing ModulesTools Required Replacing the Supervisor Engine Using Flash Memory Pcmcia Cards Supervisor EngineLocating the Flash Memory Card Write-Protection Switch Removing and Replacing the Power SupplyAC-Input Power Supply Front Panels Removing an AC-Input Power SupplyHandling an AC-Input Power Supply Installing an AC-Input Power SupplyRemoving a DC-Input Power Supply DC-Input Power Supply Front Panels 11 Handling a DC Power Supply Installing a DC-Input Power SupplyOL-0542-06 Removing the Fan Assembly Removing and Replacing the Chassis Fan Assembly13 Cisco Catalyst 5500 Chassis Fan Assembly Installing the Fan AssemblyChecking the Installation OL-0542-06